Importing solar inverters into India: BIS registration, BEE labelling and the 200 kW exemption

To import solar inverters into India, the factory needs BIS registration under MNRE's 2025 solar order, grid-connected models need a BEE label, and you must register with CPCB for e-waste and plastic EPR. Inverters above 200 kW can run on self-certification until 31 December 2026.

On the CRS list since
30 June 2021
BEE label fee
Rs 5 per kW
E-waste code (Inverter)
ITEW25
On this page
  1. Key facts
  2. What do you need to import solar inverters into India?
  3. Which approvals do solar inverters need? The full table
  4. What HS code is used for solar inverters?
  5. Which solar inverter variants are borderline, and what does each need?
  6. Which HS codes are used for solar inverters and the goods shipped with them?
  7. Is there an import ban, ALMM or licence for solar inverters?
  8. How do you get approval for solar inverters, step by step?
  9. Which BIS standards apply to solar inverters?
  10. How does BIS registration work for solar inverters in practice?
  11. What are the key dates for solar inverter rules?
  12. Do solar inverters need a BEE label?
  13. Do solar inverters need a WPC ETA?
  14. Do solar inverters need e-waste, battery or plastic EPR?
  15. What must be marked on an imported solar inverter?
  16. What should you check on the label before a solar inverter ships?
  17. How much does approval cost for a solar inverter? A worked example
  18. What does it cost to certify three solar inverter models?
  19. How long does it take to get a solar inverter ready for sale?
  20. Three common solar inverter import situations
  21. Who is responsible for what: factory, brand, importer or seller?
  22. Where do solar inverter shipments get stuck?
  23. What happens if you import solar inverters without these approvals?
  24. What changes for solar inverters in 2026 and 2027?
  25. Where can you get help with solar inverter approvals?
  26. Frequently asked questions
  27. Sources

Key facts at a glance

Governing order
Solar Systems, Devices and Components Goods Order, 2025 (MNRE)[1]
Grid-tied standards
IS 16221 (Part 2), IS 16169, IS 17980[2]
Off-grid PV standards
IS 16221 (Part 2), IS/IEC 61683[2]
On the CRS list since
30 June 2021[3]
Above 200 kW
Self-certification until 31 Dec 2026[4]
BEE
Mandatory for grid-connected models[5]
BEE label fee
Rs 5 per kW[5]
E-waste code (Inverter)
ITEW25[6]
BIS processing fee
Rs 50,000 incl. one test report[7]
BIS licence validity
5 years, renewable for 5[8]

Checked 1 November 2026 against the regulator's own documents.

What do you need to import solar inverters into India?

Solar inverters fall under MNRE's solar order, not MeitY's electronics order, but BIS runs the registration. For a typical grid-tied string inverter you need:

  1. BIS CRS registration, held by the factory, under the Solar Systems, Devices and Components Goods Order, 2025[1]. Grid-tied inverters must meet IS 16221 (Part 2), IS 16169 and IS 17980; off-grid PV inverters meet IS 16221 (Part 2) and IS/IEC 61683[2].
  2. BEE registration and label, because grid-connected solar inverters are on BEE's mandatory list[5], with a label fee of Rs 5 per kW[5].
  3. E-waste EPR registration with CPCB. Schedule I lists "Inverter" (ITEW25); we read that as covering PV inverters[9].
  4. Plastic packaging EPR for the packaging, and LMPC importer registration if you sell retail packs.

Two depend on the model. On our reading, a WPC ETA is needed if the inverter has Wi-Fi, Bluetooth or another radio for monitoring[10]. Battery EPR applies to hybrid inverters sold with batteries[11].

Large inverters. Inverters above 200 kW can stay on self-certification, with IEC certificates, until 31 December 2026[4].

Not sure which of these your model triggers? Run it through the approval checker, or send us the datasheet for a free compliance check.

Which approvals do solar inverters need? The full table

Official fees only, excluding GST.

Approvals for importing solar inverters into India (2026)
ApprovalWhy it appliesWho holds it / issues itOfficial feeTimeValidity
BIS CRS (Scheme-II)PV inverters are items 4 and 5 of MNRE's 2025 order[2]Factory; BISRs 1,000 + Rs 50,000 + Rs 1,000 a year[7]20 working days if clean[12]5 years, renewable for 5[8]
BEE registration and labelGrid-connected solar inverters are a Schedule A (mandatory) appliance[5]Brand/permittee; BEERs 5,000 company + Rs 5,000 per model + Rs 5 per kW label fee[5]30 working days scrutiny[5]3 years per model[5]
WPC ETAOnly for models with Wi-Fi/Bluetooth monitoring[10]Importer; DoT WPCRs 10,000 per model[13]Certificate on submission[14]Model lifetime[13]
E-waste EPRInverter is EEE code ITEW25[6]Importer; CPCBRs 10,000 for a new producer[15]-Quarterly and annual returns[6]
Battery EPRHybrid inverters with batteries[11]Importer; CPCBRs 10,000 (turnover under Rs 5 crore)[16]-Annual returns
Plastic EPRPlastic packaging[17]Importer; CPCBRs 10,000 under 1,000 TPA[18]-Annual returns
LMPC importer registrationRetail pre-packs only[19]Importer; State Legal MetrologyRs 500[20]Within 90 days of first import[20]Until cancelled[21]

What HS code is used for solar inverters?

Solar inverters are static converters under heading 8504 40. The line usually used is 85044010, "Electric inverter"[22]. We have not found an official ruling specific to PV inverters, so confirm the line with your broker.

REEIMS does not cover inverters. DGFT's REEIMS rule lists only solar glass (70071900), cells (85414200) and modules (85414300) for solar projects[23]. An inverter shipped on its own does not need REEIMS registration. A mixed shipment with modules does, for the module lines.

Which BIS category? This is the borderline that matters most:

  • Grid-tied (on-grid) PV inverters are "Utility-Interconnected Photovoltaic inverters"[3].
  • Off-grid and other PV inverters are "Power converters for use in photovoltaic power system"[3].
  • Home UPS and inverters without PV input are a different MeitY category, UPS/Inverters up to 10 kVA, under IS 16242 (Part 1)[3]. See UPS and inverters.
  • Solar storage batteries sold with hybrid systems are a separate item under IS 16270:2023[2].

Which solar inverter variants are borderline, and what does each need?

The approvals change with three things: whether the inverter feeds the grid, whether it ships with a battery, and whether it has a radio. This matrix sets out each common variant. Where a row says "our reading", no official ruling names that variant.

Solar inverter variants and the approvals each triggers (official categories cited; inferences marked)
VariantBIS itemBEE labelWPC ETAOther
Grid-tied string inverter, no radioUtility-interconnected PV inverter, IS 16221 (Part 2), IS 16169, IS 17980[2]Mandatory[5]NoE-waste EPR (ITEW25, our reading)[9]
Grid-tied inverter with Wi-Fi or Bluetooth stickSame as aboveMandatoryYes, self-declaration[10]A separately sold dongle needs its own ETA
Grid-tied microinverterUtility-interconnected PV inverter on our reading[3]Mandatory if grid-connected[5]Yes if it has a wireless gatewayConfirm the series grouping with your lab
Off-grid PV inverterPower converter for PV systems, IS 16221 (Part 2) and IS/IEC 61683[2]Not on the mandatory list; scope not checkedOnly with a radio-
Hybrid inverter sold without batteryGrid-tied item if it exports to the gridCheck scope with BEE[24]Usually yes (app monitoring)-
Hybrid inverter sold with batteryInverter item plus storage battery under IS 16270:2023[2]As aboveUsually yesBattery EPR[11]
Inverter with 4G data logger and SIMInverter item as aboveAs aboveYes for the radioSIMs and eSIMs are an MTCTE Phase-4 product[25]
Central inverter above 200 kWCovered, but self-certification allowed to 31 Dec 2026[4]Reported scope is up to 100 kW[24]Only with a radioIEC certificates and accredited lab reports needed
Home UPS or inverter with no PV inputUPS/Inverters up to 10 kVA, IS 16242 (Part 1)[3]Not the solar inverter entryOnly with a radioSee UPS and inverters

Which HS codes are used for solar inverters and the goods shipped with them?

Use 85044010 for the inverter itself, and declare batteries, modules and spare parts on their own lines. The import schedule does not have a separate line for PV inverters, and no customs ruling specific to PV inverters was found, so treat this table as a starting point for your broker. Our HS code approval finder maps each code to the approvals it usually triggers.

HS codes for a solar inverter shipment (confirm with your customs broker)
What is in the shipmentUsual ITC(HS) lineWhat the line triggers
Solar inverter (grid-tied, off-grid or hybrid)85044010, Electric inverter[22]BIS CRS under MNRE order; BEE for grid-connected
Alternative sometimes used for converters and UPS85044090, Static converters: Other[22]Same BIS item; the line does not change BIS scope
Lithium-ion battery packs for hybrid kits85076000, Lithium-ion accumulators[22]Battery EPR; solar storage battery item under IS 16270[2]
Solar modules in the same container85414300[23]REEIMS for project imports[23]; BIS for modules
Solar cells only85414200[23]REEIMS for project imports

Is there an import ban, ALMM or licence for solar inverters?

No. Solar inverters are not prohibited or restricted imports, they do not need a DGFT licence and there is no ALMM list for them as of 1 November 2026. The gate is BIS: goods covered by a compulsory registration order cannot be imported unless they conform and carry the Standard Mark[26].

ALMM is for modules and cells, not inverters. MNRE's ALMM order lists approved module models (List-I) and cells (List-II)[27]. Business Standard reported in September 2025 that the minister asked officials to work on an ALMM-type list for inverters, but we found no MNRE order creating one[28]. If one is notified it would, like the module list, be a procurement rule for government and scheme projects rather than a customs condition[29]. See solar panels for how ALMM works today.

REEIMS does not apply to inverters. It covers only solar glass, cells and modules[23].

Customs checks BIS. For electronics under MeitY's order, CBIC has reportedly told officers to check BIS registration on every consignment and send random samples for testing[30]. Solar inverters fall under MNRE's order, but expect the same R-number check at the port. Keep the licence copy with your customs clearance documents.

How do you get approval for solar inverters, step by step?

In this order. BEE testing can only follow the BIS work, so plan for both.

  1. 1
    Classify each model

    Decide whether each model is grid-tied, off-grid or hybrid, and its rated power. Grid-tied and off-grid models are different BIS items[2], and models above 200 kW have their own timeline[4].

  2. 2
    Factory registers on the CRS portal

    The manufacturer gets a crsbis.in login[31]. A foreign factory nominates an Authorised Indian Representative[12].

  3. 3
    Test at a BIS-recognised lab

    Generate a test request and send samples within 60 days[31]. Group ratings into series per the applicable guidelines[12].

  4. 4
    Apply for CRS

    Apply within 90 days of the test report[12]. Send the original notarised affidavit so BIS receives it within 30 days[32].

  5. 5
    Register with BEE

    Register the company once, then each model, on the BEE Star Label portal; label permission must come before any label is fixed[5]. Each brand is registered separately[33].

  6. 6
    File an ETA if the inverter has a radio

    For Wi-Fi or Bluetooth monitoring, file a self-declaration ETA on Saral Sanchar with an RF test report[34].

  7. 7
    Register with CPCB and Legal Metrology

    Register for e-waste EPR[6], plastic EPR[17], battery EPR if batteries ship with the inverter, and LMPC for retail packs[20].

  8. 8
    Label and ship

    Print the Standard Mark with the R-number[35], the BEE label with its QR code[5], and the EPR and Legal Metrology details.

Which BIS standards apply to solar inverters?

The 2025 order lists two inverter items[2]:

BIS standards for solar inverters under the 2025 order
Item in the orderIndian StandardsWhat each coversCRS portal date
4. Power inverters for use in photovoltaic power systemIS 16221 (Part 2):2015/IEC 62109-2:2011; IS/IEC 61683:1999Inverter safety; efficiency measurement30 June 2021[3]
5. Utility-interconnected PV invertersIS 16221 (Part 2):2015; IS 16169:2019/IEC 62116:2014; IS 17980:2022/IEC 62891:2020Safety; islanding prevention; MPPT efficiency30 June 2021[3]
3. Storage battery (for PV)IS 16270:2023Secondary cells and batteries for solar PV1 January 2019[3]

How does BIS registration work for solar inverters in practice?

Same scheme as electronics. Solar products are certified under BIS Scheme-II, the Compulsory Registration Scheme[36]. The licence goes to the manufacturer for each factory, not to the importer[26], and each brand needs its own application[12].

Old licences. Licences issued under the 2017 order remain valid, but renewals and fresh grants are made under the 2025 order[2]. The 2017 order listed IS 16221 Parts 1 and 2 and IS 16169 for inverters[37]; the 2025 order adds IS 17980 (MPPT efficiency) for grid-tied models[2].

Inverters above 200 kW. Test facilities for large central inverters are limited, so MNRE lets them run on self-certification. The first relief, S.O. 3597(E) of 5 August 2025, ran to 30 June 2026[38]. S.O. 3706(E) of 3 July 2026 extended it to 31 December 2026 or further orders, whichever is earlier[4]. The condition: the maker must hold valid IEC certificates for the specified standards and test reports from accredited labs[4]. Plan for a BIS licence for large inverters from 2027 unless MNRE extends again.

Series and renewals. Group ratings under the series guidelines to cut test reports, and diary the CRS renewal window from day one.

Inclusion of new ratings. Add new models to an existing licence by inclusion, with a fresh test report[39]. Each additional test report in an application costs Rs 20,000[7].

What are the key dates for solar inverter rules?

Dates in this table come from the gazette notifications and BIS and BEE documents cited. Two rows rest on trade-press reports and are marked as such.

Timeline of compliance rules for solar inverters in India
DateChangeStatusSource
30 Aug 2017First MNRE solar order lists IS 16221 and IS 16169 for invertersSuperseded[37]
30 Jun 2021Implementation date shown on the CRS portal for both PV inverter itemsIn force[3]
24 Jan 2023S.O. 444(E), filed by BIS as a solar inverter extension (not opened)Historical[40]
15 Mar 2024Voluntary BEE labelling for grid-connected inverters begins (reported)Replaced by mandatory[24]
27 Jan 20252025 order adds IS 17980 (MPPT efficiency) for grid-tied invertersIn force[2]
27 Jul 20252025 order in effect, per BISIn force[41]
5 Aug 2025Self-certification for inverters above 200 kW to 30 Jun 2026Superseded[38]
1 Jan 2026BEE 2026 Regulations in force; grid-connected solar inverters on the mandatory listIn force[5]
3 Jul 2026Self-certification for inverters above 200 kW extended to 31 Dec 2026In force[4]

Do solar inverters need a BEE label?

Yes, for grid-connected solar inverters. The BEE (Appliance Labeling and Compliance) Regulations, 2026 list grid-connected solar inverters in Schedule A, the mandatory list[5]. The label fee is Rs 5 per kW[5].

Scope, as reported. Trade press reports that Ministry of Power notifications of 12 November 2025 made labelling mandatory from 1 January 2026 for grid-connected inverters without storage up to 100 kW, measured under IS 17980:2022, after a voluntary phase from 15 March 2024[24]. We have not opened those notifications, so confirm the scope for hybrid and larger models with BEE.

What it costs and takes:

  • Company registration: Rs 5,000, one time[5].
  • Security deposit per appliance category: Rs 3 lakh, or Rs 50,000 for small-scale industry, refundable[5].
  • Model registration: Rs 5,000 per model[5].
  • BEE scrutinises applications within 30 working days[5]; permission lasts 3 years[5].

Off-grid inverters. Solid-state inverters are on BEE's voluntary list at Rs 5 per piece[5]. Whether off-grid PV inverters fall in that schedule was not checked.

The BEE portal works only from Indian IP addresses unless BEE whitelists a foreign IP[33]. See BEE star label, the BEE Star Label portal guide and the list of BEE-labelled products.

Do solar inverters need a WPC ETA?

Only if they transmit. Many inverters come with a Wi-Fi or Bluetooth stick for app monitoring; those are licence-exempt radio devices and need an ETA[10]. ETAs for licence-exempt devices are granted by self-declaration on Saral Sanchar[14], at Rs 10,000 per model[13], valid for the model's life[13].

If the monitoring dongle is a separate product, the dongle needs the ETA, not the inverter. An inverter that only has RS485 or Ethernet ports needs none.

See WPC ETA fees and the ETA document list for the paperwork. From 2026 DoT is moving licences to the Telecommunications Act, 2023 portal[42]; check where to file before you start.

Do solar inverters need e-waste, battery or plastic EPR?

E-waste EPR: yes, on our reading. Schedule I lists "Inverter" under ITEW25[6]. It does not name solar inverters separately, so the mapping is our inference[9]. Importers who sell EEE are producers[6]. Unlike solar panels, inverters carry normal recycling targets: 70% for 2025-26 and 2026-27 under Schedule III[6], or 20% of sales two years earlier if your sales history is short[6]. You meet them by buying certificates from registered recyclers[6].

Battery EPR: only with batteries. An importer of batteries or equipment containing batteries is a producer[11] and must register before importing[43]. Energy-storage batteries count as industrial batteries[44].

Plastic EPR: yes, whenever the import includes plastic packaging[17].

What must be marked on an imported solar inverter?

BIS Standard Mark (see CRS labelling rules) with the IS number and R-number[35], on the product, package or both[35], plus www.bis.gov.in[45] and model, batch and manufacturer details[35].

BEE label showing the appliance, brand, model, energy performance, rated capacity, label series, country of origin and the BEE logo[5], with a QR code; the label must show at online and offline points of sale[5].

Battery marking if batteries are supplied: crossed-out wheeled bin[44] and your battery EPR number, which can be on the equipment or packaging for imports[46].

Legal Metrology declarations for retail packs[19].

What should you check on the label before a solar inverter ships?

Check every unit and carton against this list before the container is loaded. Fixing labels in India means relabelling in a bonded warehouse or at your premises, which costs more than doing it at the factory. Run the artwork through our label checker and the general product label checklist.

How much does approval cost for a solar inverter? A worked example

One grid-tied inverter series (one test report), one brand, no radio, no battery. Official fees only. The total is our arithmetic.

Official fees for one grid-tied solar inverter series, first year (our arithmetic; excludes GST, lab and consultant charges)
ItemOfficial feeSource
BIS application + processing + first annual feeRs 52,000[7]
BEE company registration (one time)Rs 5,000[5]
BEE model registrationRs 5,000[5]
BEE security deposit (refundable)Rs 3,00,000 (Rs 50,000 for SSI)[5]
E-waste EPR registration, new producerRs 10,000[15]
Plastic EPR registrationRs 10,000[18]
Total, our arithmetic (excl. deposit)Rs 82,000-
BEE label fee, e.g. 1,000 units of 5 kWRs 25,000 a year (Rs 5 x 5,000 kW)[5]
If the model has Wi-Fi monitoring+ Rs 10,000 ETA[13]

What does it cost to certify three solar inverter models?

About Rs 1,37,000 in official fees, before GST, testing and the refundable BEE deposit, if the three ratings need three test reports in one BIS application. The totals are our arithmetic. If the lab can cover all three ratings with one representative report under the series rules[12], the BIS line drops by Rs 40,000.

Adding a fourth model later costs a Rs 30,000 inclusion fee with one test report[7], plus another Rs 5,000 BEE model fee[5]. Model your own range in the compliance cost estimator or the BIS CRS fee calculator, and compare with typical market rates on BIS CRS registration costs and EPR registration costs.

Official fees for 1 model vs 3 grid-tied inverter models, first year (our arithmetic; excludes GST, lab, consultant and label fees)
Item1 model3 modelsSource
BIS application feeRs 1,000Rs 1,000[7]
BIS processing fee (includes one test report)Rs 50,000Rs 50,000[7]
Additional test reports at Rs 20,000 each-Rs 40,000[7]
BIS annual licence feeRs 1,000Rs 1,000[7]
BEE company registration (once)Rs 5,000Rs 5,000[5]
BEE model registration at Rs 5,000 eachRs 5,000Rs 15,000[5]
E-waste EPR registration, new producerRs 10,000Rs 10,000[15]
E-waste EPR portal annual maintenanceRs 5,000Rs 5,000[15]
Plastic EPR application, under 1,000 TPARs 10,000Rs 10,000[18]
Total, our arithmeticRs 87,000Rs 1,37,000-
WPC ETA if each model has Wi-Fi monitoring+ Rs 10,000+ Rs 30,000[13]
BEE security deposit (refundable, per category)Rs 3,00,000 (Rs 50,000 SSI)Same, once per category[5]

How long does it take to get a solar inverter ready for sale?

Plan on two to four months from samples to first shipment. BIS itself targets 20 working days for a clean CRS application[12], but lab testing, BEE scrutiny and the courier time for the affidavit add up. The table lists the official clocks; lab queues vary by lab and through the year. For general timing advice see how long BIS registration takes.

Official time limits for each step (lab and consultant time not included)
StepOfficial clockSource
Send samples after generating the test requestWithin 60 days[31]
Apply for CRS after the test report is issuedWithin 90 days of the report[12]
Original affidavit to reach BISWithin 30 days[32]
BIS grant, if documents and product are in orderAbout 20 working days[12]
BEE scrutiny of the model application30 working days[5]
WPC ETA by self-declarationCertificate on submission[14]
CPCB e-waste EPR: shortcomings flaggedWithin 25 working days; reply in 7[15]
CPCB plastic EPRProcessed within 15 days, else deemed[18]
LMPC importer registrationApply within 90 days of first import[20]

Three common solar inverter import situations

1. Distributor importing string inverters for rooftop installers. The factory needs BIS registration in your brand[12]. Because the inverters are grid-connected, you also need BEE model registration and labels[5]. Most string inverters ship with a Wi-Fi stick, so file an ETA for it[10].

2. EPC contractor importing a 250 kW central inverter for a utility project. Inverters above 200 kW can be supplied on self-certification with IEC certificates and accredited lab reports until 31 December 2026[4]. If commissioning slips into 2027, check whether MNRE has extended the date again.

3. Online seller of hybrid inverter-battery kits. The inverter needs BIS registration; the solar battery has its own BIS item under IS 16270:2023[2]. Battery EPR applies because you import equipment with batteries[11]. Marketplaces must show the Legal Metrology declarations, reportedly[49], and BEE checks labels on e-commerce listings too[5].

Who is responsible for what: factory, brand, importer or seller?

The factory holds the BIS licence, the brand holds the BEE permission, and the importer holds the EPR, LMPC and (usually) ETA registrations. The seller must not list or sell a non-compliant unit. Mixing these up is the most common reason a project order sits at the port.

Who holds each solar inverter approval
PartyWhat it must hold or doSource
Foreign factoryBIS CRS licence per factory and brand, through an Authorised Indian Representative[26][12]
Authorised Indian RepresentativeIndian resident who takes responsibility for BIS compliance for the factory[50]
Brand ownerBEE company and model registration, label fees each quarter[33][5]
ImporterIEC, e-waste, plastic and (if batteries) battery EPR, LMPC registration, ETA for radio models[51][6][20]
Distributor or installerBuy only BIS-marked models; do not store for sale non-conforming goods[26]
Online seller and marketplaceShow the BEE label and the Legal Metrology declarations on the listing[5][49]

Where do solar inverter shipments get stuck?

Common problems for imported solar inverters
ProblemWhy it mattersFix
Model registered as a home UPS, sold as a solar inverterUPS (IS 16242) and PV inverters are different categories[3]Register under the PV inverter item
Grid-tied model without BEE labelMandatory appliance; no label without BEE permission[5]Register the model with BEE before sale
Rating on box not on licenceUnregistered models cannot be imported[26]Add by inclusion[39]
Wi-Fi stick without ETAETA needed for RF devices[13]File the self-declaration
Large inverter after the relief dateSelf-certification ends 31 Dec 2026 unless extended[4]Start BIS testing early
No plastic EPR proofCPCB asked Customs to check it[52]Register as an importer

What happens if you import solar inverters without these approvals?

BIS. The 2025 solar order makes contraventions punishable under the BIS Act, 2016[2]: up to two years in prison, or a fine of at least Rs 2 lakh (Rs 5 lakh for repeat offences) extendable to ten times the value of the goods, or both, under section 29(3) as enacted[53].

BEE. If a label violation is not explained within 30 days of a show-cause notice, BEE forfeits the security deposit and suspends the model registration for a year, with further penalties under the 2025 compliance rules[5]. Failing a check test twice can lead to stock withdrawal[5].

E-waste and plastic EPR. Producers' non-target violations cost Rs 20,000 to Rs 80,000[54]; plastic target shortfalls cost Rs 2,900 to Rs 7,900 a tonne[55].

Legal Metrology. Missing retail declarations: improvement notice, then up to Rs 5 lakh, then Rs 25-50 lakh[56].

What changes for solar inverters in 2026 and 2027?

Four dated changes matter. Track them on our 2026 rules ledger.

  • BIS licences now run five years. Since the 25 February 2026 amendment a CRS licence is granted for five years and renewed for five, with fees paid each year[8].
  • BEE labelling became mandatory on 1 January 2026 for grid-connected solar inverters, under the 2026 regulations[5].
  • The 200 kW relief ends 31 December 2026 unless MNRE extends it again[4]. Large inverters landing in 2027 should have a BIS licence or a fresh extension in writing.
  • DoT authorisations moved to the Telecommunications Act portal in 2026[57]. Check where to file before you apply for an ETA.
  • Possible inverter ALMM. Reported as under consideration, not notified[28].

Where can you get help with solar inverter approvals?

Start with the factory: most export-oriented inverter makers already hold IEC certificates and test reports, and some already hold an Indian R-number for another brand. Then use these:

Frequently asked questions

Is BIS certification mandatory for solar inverters?

Yes. PV inverters and grid-tied inverters are items 4 and 5 of MNRE's Solar Systems, Devices and Components Goods Order, 2025[2]. The CRS portal shows both as compulsory since 30 June 2021[3].

Which IS standards apply to grid-tied solar inverters?

IS 16221 (Part 2):2015 for safety, IS 16169:2019 for islanding prevention and IS 17980:2022 for MPPT efficiency[2].

Do inverters above 200 kW need BIS?

They are covered, but MNRE allows self-certification with valid IEC certificates and accredited lab reports until 31 December 2026 or further orders, whichever is earlier[4].

Is the BEE label mandatory for solar inverters?

Yes for grid-connected solar inverters, which are on BEE's mandatory Schedule A[5]. The label fee is Rs 5 per kW[5].

Do solar inverters need REEIMS registration?

No. REEIMS covers solar glass, cells and modules (70071900, 85414200, 85414300) for solar projects, not inverters[23].

What HS code is used for solar inverters?

Usually 85044010, electric inverter, under static converters[22]. No official ruling for PV inverters was found; confirm with your broker.

Is a home UPS the same BIS category as a solar inverter?

No. Home UPS/inverters up to 10 kVA are a MeitY CRS category under IS 16242 (Part 1)[3], while PV inverters are under MNRE's solar order[2].

Do hybrid inverters need battery EPR?

If you import them with batteries, yes: importers of equipment containing batteries are producers under the battery rules[11].

Is there an ALMM list for solar inverters?

Not as of 1 November 2026. ALMM covers solar modules (List-I) and cells (List-II)[27]. An inverter list was reported as under consideration in September 2025, but no MNRE order has been found[28].

How much does BIS registration cost for three solar inverter models?

In official fees, about Rs 92,000 if three test reports go in one application: Rs 1,000 application, Rs 50,000 processing with one report, Rs 40,000 for two more reports and Rs 1,000 annual fee[7]. That is our arithmetic, before GST and lab charges.

Who applies for BIS for an imported solar inverter, the importer or the factory?

The factory. CRS licences are granted to the manufacturer per manufacturing unit, not to importers[26]. A foreign factory nominates an Authorised Indian Representative[12].

Sources 58 documents, 50 official

Each number in the text links to the document below. Labels show the type of source; see our editorial policy.

  1. Gazette Solar Systems, Devices and Components Goods Order, 2025 (Gazette copy on BIS site) · 27 January 2025
  2. Gazette Solar Systems, Devices and Components Goods Order, 2025 · 27 January 2025
  3. Official portal Products under CRS - crsbis.in (Products BIS list)
  4. Gazette MNRE S.O. 3706(E), 3 Jul 2026 · 3 July 2026
  5. Gazette Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026 - Notification No. 5506/BEE/S&L/AL/2025-26 dated 26 Dec 2025, Gazette of India Extraordinary Part III Sec 4 (CG-DL-E-29122025-268894) · 26 December 2025
  6. Gazette E-Waste (Management) Rules, 2022 - G.S.R. 801(E), Gazette of India (CPCB copy) · 2 November 2022
  7. Official portal BIS CRS Fee Structure (applicable w.e.f. 04 June 2018) · 4 June 2018
  8. Official circular BIS notice: Revised Provisions for Licence Validity, Renewal and Annual Fee Payment under CRS (circular dated 27 May 2026) · 27 May 2026
  9. Gazette E-Waste (Management) Rules, 2022 · 2 November 2022Not yet confirmed officially
  10. Official portal DoT WPC ETA pageNot yet confirmed officially
  11. Gazette Battery Waste Management (Amendment) Rules, 2023 - S.O. 4669(E) · 25 October 2023
  12. Official circular Guidelines for Grant of Licence (GoL) under Scheme-II of Schedule-II, BIS (Conformity Assessment) Regulations 2018, Ref RG:01 · 20 August 2019
  13. Official portal Equipment Type Approval (ETA) - DoT eServices Portal (last updated 28-05-2025) · 28 May 2025
  14. Official circular DoT WPC OM No. R-11017/01/2018-PP(part-1) dated 09.09.2024 - Issuance of ETA for License-Exempt Wireless Equipment Devices · 9 September 2024
  15. Official circular CPCB SOP for grant of registration to Producers under E-Waste (Management) Rules, 2022 (April 2023; copy hosted by Pollution Control Board Assam) · 1 April 2023
  16. Official portal CPCB SOP for Registration of Producers through the Online Portal under BWM Rules, 2022
  17. Gazette Plastic Waste Management (Amendment) Rules, 2024 - G.S.R. 201(E) (gazette copy hosted by TNPCB) · 14 March 2024
  18. Official portal CPCB SOP for Registration of Producer, Importer & Brand Owners through Plastic EPR Portal (15 Mar 2022) · 15 March 2022
  19. Official circular Lok Sabha Unstarred Question No. 2673 (07.08.2024): Legal Metrology (Packaged Commodities) Rules, 2011 - answer by MoS Consumer Affairs · 7 August 2024
  20. Official portal The Legal Metrology (Packaged Commodities) Rules, 2011 (G.S.R. 202(E), 7 March 2011) - copy hosted by Directorate of Legal Metrology, West Bengal · 7 March 2011
  21. Gazette G.S.R. 418(E), 29 May 2026 - Legal Metrology (Packaged Commodities) Third Amendment Rules, 2026 (Gazette of India, Extraordinary) · 29 May 2026
  22. Official portal DGFT ITC(HS) code lookup (Export-Import Policy & Statistics)Not yet confirmed officially
  23. Gazette DGFT Notification 40/2025-26 (S.O. 4669(E)), copy hosted on MNRE's REEIMS portal · 10 October 2025
  24. Reported SolarQuarter / Energetica India reports · 17 November 2025Not yet confirmed officially
  25. Official portal List of Telecom products notified under MTCTE along with their effective mandatory certification date (DoT/TEC)
  26. Official portal About CRS - crsbis.in
  27. Official circular MNRE O.M. No. 283/59/2024-GRID SOLAR, 9 Dec 2024 · 9 December 2024
  28. Reported Business Standard: Govt mulls ALMM for solar inverters · 22 September 2025Not yet confirmed officially
  29. Official circular MNRE O.M. No. 283/64/2025-GRID SOLAR, FAQs on ALMM for solar PV cells (23 Sep 2025) · 23 September 2025
  30. Reported CBIC Instruction F.No. 401/67/2023-Cus-III dated 12.12.2023 (signed copy hosted by LiveLaw); number 28/2023 per TaxGuru · 12 December 2023Not yet confirmed officially
  31. Official portal Registration - crsbis.in
  32. Official portal Procedure for filing Form I under Smart Registration v1.0
  33. Official portal BEE - FAQs on Star Label Portal Appliance Registration under S&L Programme
  34. Official portal ETA Self Declaration Applicant Manual - Saral Sanchar (DoT)
  35. Gazette BIS Registration Dept circular 06.09.2019 on marking + Scheme-II para 6 and Annexures I-III (Gazette extract) + e-labelling circular 13.09.2017 · 4 June 2018
  36. Official portal BIS - Products under Compulsory Certification, Scheme-II (Registration Scheme/CRS), last updated 26 Oct 2026 · 26 October 2026
  37. Gazette Solar PV Goods (Requirements for Compulsory Registration) Order, 2017 · 30 August 2017
  38. Gazette MNRE S.O. 3597(E), 5 Aug 2025 · 5 August 2025
  39. Official portal Inclusion and Renewal - crsbis.in
  40. Official portal BIS Scheme-II (Registration Scheme) product list
  41. Official circular BIS guidelines for transition to IS/IEC 61730-1/-2:2023 (30 Dec 2025) · 30 December 2025
  42. Official portal DoT eServices Portal - notice displayed on ETA/Saral Sanchar pages
  43. Official portal CPCB FAQs (General) under Battery Waste Management Rules, 2022
  44. Gazette Battery Waste Management Rules, 2022 - S.O. 3984(E), Gazette of India · 22 August 2022
  45. Official circular BIS Registration Dept circular 06.09.2019 · 6 September 2019
  46. Official circular CPCB Notice dated 28 May 2024 on MoEFCC OM of 17 May 2024 (recycled material and labelling) · 28 May 2024
  47. Gazette Plastic Waste Management (Second Amendment) Rules, 2022 - G.S.R. 522(E) · 6 July 2022
  48. Gazette Plastic Waste Management (Amendment) Rules, 2025 - G.S.R. 73(E), Gazette of India · 23 January 2025
  49. Reported S.S. Rana & Co. - E-commerce websites now come under the purview of the Legal Metrology Act; Lok Sabha answer cited in search results · 23 June 2017Not yet confirmed officially
  50. Official portal Nomination of AIR - BIS FMCS · 5 February 2026
  51. Official portal Foreign Trade Policy 2023, Chapter 2: General Provisions Regarding Imports and Exports (revised, v1.2.2)
  52. Court order CPCB compliance report to NGT in O.A. 993/2024 with O.A. 926/2024 (dated 06.07.2026) · 6 July 2026
  53. Gazette The Bureau of Indian Standards Act, 2016 (Act No. 11 of 2016) · 21 March 2016
  54. Official circular CPCB Guidelines for Environment Compensation (EC) under E-Waste (Management) Rules, 2022 (August 2024; copy hosted by TNPCB)
  55. Official circular CPCB Revised Guidelines for Assessment of Environment Compensation for Violation of PWM Rules, 2016 (August 2024)
  56. Gazette The Jan Vishwas (Amendment of Provisions) Act, 2026 (No. 8 of 2026), Gazette of India Extraordinary Part II Sec 1, 8 April 2026 (CG-DL-E-08042026-271642), copy hosted on dgma.gov.in · 8 April 2026
  57. Official portal DoT eServices - Saral Sanchar portal notice on Telecommunications Act 2023 authorisations
  58. Reported WPC ETA Certificate in India - Professional Utilities (modified 23 June 2025) · 23 June 2025Not yet confirmed officially

Where should you go next?

  • Product guides46 pages: every approval a product needs, product by product
  • Checklists7 pages: tick-box lists for each stage, from sampling to listing
  • Compliance costs7 pages: official fees and typical private charges, approval by approval
  • Free tools7 pages: approval checker, HS code finder, fee and cost calculators
Comploa Editorial DeskImport compliance researchers

We read the gazette notifications, regulator circulars and portal guidance behind Indian import approvals, and cite the document for every fact. When a rule changes, we update the page and its date. How we research and correct · About Comploa.

Related guides

Terms used on this page

Compulsory Registration Scheme (CRS)BIS's Scheme-II registration: manufacturers of notified products self-declare conformity to an Indian Standard, backed by a recognised lab report, and mark goods with a registration number.R-numberThe unique registration (licence) number BIS issues to a manufacturer under the Compulsory Registration Scheme, printed as part of the CRS Standard Mark on the product or package.Standard MarkThe mark BIS authorises a licence holder to apply to goods conforming to an Indian Standard, such as the ISI mark (Scheme-I) or the CRS registration mark (Scheme-II).Star ratingThe 1 to 5 star energy level shown on a BEE label, based on the star table the Government notifies for that appliance and valid for a fixed label series.Equipment Type Approval (ETA)An approval issued by the WPC Wing of India's Department of Telecommunications, required to import, sell and use wireless devices operating in de-licensed frequency bands.EEE codeThe code (such as ITEW15 or CEEW1) that Schedule I of the E-Waste (Management) Rules, 2022 assigns to each type of electrical and electronic equipment covered by e-waste EPR.HS code (ITC(HS) code)The Harmonized System number used to classify traded goods; India's 8-digit version, the ITC(HS) code, is declared on the Bill of Entry for every import.Authorised Indian Representative (AIR)An Indian resident nominated by a foreign manufacturer to take responsibility, on its behalf, for compliance with the BIS Act, rules, regulations and licence conditions.
Get alerts when solar inverters rules change

New QCOs, deadline extensions and fee changes, sourced and dated. Only when something changes.

Free compliance check

Ship it once. Clear it first time.

Tell us the product, the model and where it is made. We reply with every approval it needs, the official fees, a realistic timeline and the order to file in.

  • Free, no obligation
  • Reply within one working day
  • Every fact sourced