- How long does BIS registration take in 2026?
- BIS timelines compared: CRS, ISI and FMCS
- Where does the time go in a CRS registration?
- How long does BIS lab testing take, and can you shorten it?
- What makes a CRS registration faster or slower?
- How much time does a rejection or query cost?
- Worked example: a realistic CRS plan for a new power bank model
- The rules behind the worked example
- Do some products take longer than others?
- Does the IS/IEC 62368-1 migration add time?
- Why do ISI and FMCS take longer than CRS?
- Does a foreign factory take longer than an Indian one?
- How long does a BIS licence last once granted?
- How does BIS compare with the other approvals you need?
- Can a consultant make BIS registration faster?
- How should you plan around BIS timelines?
- Frequently asked questions
- Sources
Key facts at a glance
- CRS grant target
- 20 working days, if all in order[1]
- CRS testing time
- Depends on lab workload[2]
- Sample to lab
- Within 60 days of test request[3]
- Lab report after testing
- Within 7 days of completion[4]
- Report to application
- Within 90 days of report issue[1]
- Query reply window
- At least 30 days[1]
- ISI licence (option 2)
- About 1 month average[5]
- ISI licence (option 1)
- About 4 months average[5]
- FMCS licence
- About 6 months average[6]
- CRS validity (2026)
- 5 years[7]
- Renewal lead time
- Apply 3 months before validity ends[8]
Checked 2 November 2026 against the regulator's own documents.
How long does BIS registration take in 2026?
BIS's official figures are 20 working days for CRS after testing, about one or four months for ISI, and about six months for FMCS. It depends on the scheme, and on how much of the time is in your hands.
- CRS (electronics): BIS states that the grant-of-licence process is expected to be completed within 20 working days, provided documentation and product conformity are satisfactory at first instance[1]. Before that comes testing, which the CRS FAQ says depends on the chosen lab's workload and on the manufacturer supplying technical details[2]. See the BIS CRS guide.
- ISI mark (Scheme-I) for Indian factories: the average time to grant is about one month under option 2 (test report from a BIS or recognised lab) and four months under option 1, from receipt of a complete application[5]. See the ISI mark guide.
- FMCS (ISI mark for factories abroad): BIS says the average is generally six months from recording of a complete application[6]. See the FMCS guide.
None of these is a guarantee. Each figure assumes a complete, correct file, and each excludes the preparation time on your side. Anyone who promises a fixed date for a BIS licence is promising something BIS itself does not. If you are not sure which scheme your product falls under, read CRS vs ISI vs FMCS or run the approval checker first.
BIS timelines compared: CRS, ISI and FMCS
The official figures measure different things, so compare the 'clock starts' column before comparing the numbers.
| Scheme | Official figure | Clock starts | What is not included | Source |
|---|---|---|---|---|
| CRS (Scheme-II) | 20 working days | Complete, conforming application | Lab testing; query rounds; affidavit by post | [1] |
| ISI, option 2 (simplified) | About 1 month average | Receipt and recording of complete application | Lab test before applying | [5] |
| ISI, option 1 (normal) | About 4 months average | Receipt and recording of complete application | Delays from queries | [5] |
| FMCS | About 6 months average | Recording of complete application | Visa and travel for BIS officers; sample testing in India | [6] |
Where does the time go in a CRS registration?
Mostly in preparation and lab testing; the 20 working days are only the last stage. A CRS file goes through these stages, with BIS's deadlines where they exist. The BIS CRS application checklist turns them into a to-do list.
| Stage | Typical driver of time | Fixed rule | Source |
|---|---|---|---|
| 1. Portal login for the factory | Business licence in English or certified translation | None stated | [3] |
| 2. AIR nomination (foreign factories) | Finding an eligible Indian representative | AIR can represent only one foreign maker | [9] |
| 3. Test request and sample shipment | Shipping and customs for samples | Sample at lab within 60 days of request | [3] |
| 4. Lab testing | Lab workload; technical details from the factory | No fixed time | [2] |
| 5. Lab issues report | Lab's internal review | Within 7 days of completing testing | [4] |
| 6. Filing Form I | Preparing forms, affidavit, fees | Report not over 90 days old on receipt | [1] |
| 7. Original affidavit by post | Courier to BIS | Must arrive within 30 days of online submission | [10] |
| 8. BIS scrutiny and grant | Completeness and conformity | Expected within 20 working days if in order | [1] |
| 9. Queries, if any | Quality of your reply | At least 30 days given to reply | [1] |
How long does BIS lab testing take, and can you shorten it?
There is no official testing time; it depends on the lab's queue and on how quickly the factory supplies technical details[2]. What BIS does fix is the edges: samples must reach the lab within 60 days of the test request[3], and once testing is complete a recognised lab must issue the report within 7 days and may not withhold it[4].
Lab choice matters for speed and price. On 1 November 2026 BIS's LIMS listed 68 labs recognised for IS 13252 (Part 1), with declared charges from Rs 25,000 to Rs 2,00,000[11], and 72 lab entries for IS 16046 battery testing, from Rs 37,500 to Rs 4,80,000[12]. With that many labs, it is worth asking three or four for their current queue in writing. Our CRS test labs guide and the city pages for Delhi NCR, Bengaluru and Mumbai and Pune help you shortlist.
Two tools can save weeks:
- Parallel testing. Since 9 January 2024 components and the end product can be tested at the same time for all CRO 2021 categories, though BIS grants licences in sequence and the manufacturer carries the risk if a component fails[13].
- Getting the test request right first time. Product category, models and brands in the test request cannot be changed at the application stage; an error means cancelling and generating a fresh request[14].
What makes a CRS registration faster or slower?
Clean paperwork and grouped models make it faster; queries, expired reports and late affidavits make it slower.
Things that slow it down:
- A query round. Each deficiency notice gives you at least 30 days to respond[1]; a sloppy reply invites another round.
- An expired report. A report more than 90 days old on receipt cannot be used[1], which sends you back to the lab.
- A late affidavit. If BIS does not have the original within 30 days of online submission, the application is liable to be cancelled[10].
- Samples stuck in transit. The 60-day sample window runs while the box sits at the port[3]. See importing samples for BIS testing.
- Several brands. Each brand needs its own application unless the brand owner is the same[1].
Things that speed it up:
- Series grouping. Testing a representative model and adding others via supplementary reports[1]. Most electronics categories allow up to 10 models in one series[15]; see series guidelines.
- A common report for several brands from the same factory[16].
- Inclusion instead of a new licence when you add models later[17].
- A ready AIR and a clean business licence before the test request is generated[3].
How much time does a rejection or query cost?
At least a month per query round, and a rejection can mean starting again from testing. BIS gives at least 30 days to answer a deficiency notice[1]. If the reply is not satisfactory, BIS can reject the application; its listed grounds include a non-conforming test report, false declarations, tampered documents and failure to answer queries in time[18]. Fees are not refunded when an application is rejected after processing because of unsatisfactory replies[19].
Most delays come from mismatches, not product failures. BIS's own list of frequent deficiencies includes factory names and addresses that differ across documents, missing or unsigned AIR nominations, brand certificates that do not match the label in the report, and wrong model numbers in the undertaking[20]. At the login stage, missing or conflicting English translations of a foreign business licence are a common hold-up[21].
There is limited relief: a BIS DDG may accept test reports outside the time norms for genuine reasons on justification[18]. Do not plan around it. Our CRS rejections guide lists each common reason and its fix.
Worked example: a realistic CRS plan for a new power bank model
Plan in stages with BIS's fixed windows as anchors. This is an illustration, not a promise. A brand owner in India asks its supplier abroad to register a new power bank, a CRS category under IS 13252 (Part 1)[22], with the Indian company as AIR[23]. The only fixed numbers in the plan are BIS's windows; the rest depends on the lab and on how fast each party works.
- 1Prepare the file before testing
Get the factory's portal login, the AIR nomination and the affidavit draft ready, so nothing waits on paperwork once the report is out.
- 2Generate the test request and ship samples
Generate the request only when samples are packed, because they must reach the lab within 60 days.
- 3Testing at the lab
Ask the lab for its current queue and expected report date in writing. This is the stage with no fixed time.
- 4File as soon as the report is verified
Submit Form I with fees the same week, well inside the 90-day window, and courier the original affidavit immediately.
- 5BIS scrutiny
Expect about 20 working days if the file is complete and the product conforms; plan for one query round to be safe.
- 6Print labels after grant
Only then print the Standard Mark with the R-number, and ship.
The rules behind the worked example
Every fixed window in the example is a BIS rule; the query buffer is our planning assumption. The 60-day sample window[3], the 90-day report window[1], the 30-day affidavit deadline[10] and the 20-working-day target[1] are BIS rules. Printing the mark only after grant follows from the rule that the Standard Mark carries the licence's R-number[24] and must not be applied outside the licence scope[25]. When queries come, the minimum reply window is 30 days[1].
Put together, a clean file runs: sample shipment (up to 60 days allowed), testing (lab-dependent), report issue (up to 7 days after testing[4]), filing (inside 90 days), then about 20 working days of scrutiny. Add 30 or more days for each query round. To budget the fees for the same plan, use the CRS fee calculator and our guide to BIS certificate cost.
Do some products take longer than others?
Yes. Products with extra requirements or standards in transition need more testing, and some categories are not yet enforceable at all. The table shows what adds time for common products.
| Product | What adds time | Date to know | Source |
|---|---|---|---|
| Lithium-ion battery packs | Rated capacity must also be verified for IS 16046 (Part 2) cells and batteries | Existing licensees by 30 April 2027; no new licence without it after that | [26] |
| CCTV cameras | Essential Requirements for security on top of IS 13252 (Part 1), reportedly | Amendment of 9 April 2024 | [27] |
| Televisions | IS 18112 testing for satellite reception | Implementation moved to 26 January 2027 | [28] |
| LED bulbs | Revised IS 16102 (Part 1):2026 | Implementation extended to 2 February 2027 | [29] |
| Standalone hard disk drives | New category beyond USB external drives | Deferred to 1 May 2027 | [30] |
| Smartphone screen protectors | New category under IS 19348:2025 | Effective 1 April 2027 | [31] |
| Mobile phones | Indian language support standard IS 16333 (Part 3) as well as safety | In force | [32] |
Does the IS/IEC 62368-1 migration add time?
Not for a new application today, but it adds a testing project for existing licensees before 1 November 2028. New applications can still be processed under IS 13252 (Part 1) or IS 616, or under IS/IEC 62368-1:2023, until 1 November 2028, with a declaration to implement the new standard[33]. BIS encourages new applications under the new standard[34], which avoids testing twice.
Existing licensees in 38 categories must submit complete IS/IEC 62368-1:2023 reports for all lead models by 1 November 2028[35]. BIS says one representative sample per licence is not enough, migrating registered models through the Standard Revision module carries no fee, and separate reports are needed for each manufacturing location[36]. The R-number stays the same[34]. See IS/IEC 62368-1 for the details and the compliance calendar for the deadline.
Why do ISI and FMCS take longer than CRS?
Because BIS inspects the factory. Under Scheme-I option 1, BIS scrutinises the application, visits the factory and draws samples for testing; under option 2 the applicant submits a test report with the application and BIS then verifies the factory[37]. That is why option 2 averages about one month and option 1 about four[5].
FMCS adds international travel. BIS officers visit the foreign factory to verify manufacturing and testing infrastructure and draw samples for independent testing, and the licence is granted after a satisfactory inspection and conforming test reports[6]. All FMCS visits are treated as special visits, with the applicant paying officers' travel[38], and samples are tested in India at the applicant's cost[39]. After grant, the manufacturer must furnish a USD 10,000 performance bank guarantee[6]. Since 1 June 2026 FMCS applications are accepted online only[40].
One recent change helps Indian Scheme-I factories: a BIS circular of 16 December 2025 says manufacturers no longer need an in-house laboratory to operate BIS certification, and may use shared, cluster or sub-contracted testing[41]. For fees, see ISI licence costs.
Does a foreign factory take longer than an Indian one?
Under CRS, usually only at the start, because a foreign factory needs a translated business licence and an AIR before it can file. Under Scheme-I, yes: an Indian factory uses the ISI route and a foreign one uses FMCS, which BIS says averages about six months[6].
| Step | Indian factory | Foreign factory | Source |
|---|---|---|---|
| CRS portal login | Business licence | Business licence in English or certified translation | [3] |
| Indian representative | Not needed | AIR nominated on Form IV | [1] |
| AIR limits | Not applicable | One foreign maker per AIR, except group companies | [9] |
| Samples to Indian lab | Local courier | Import of samples; the CRO does not apply to goods imported for testing | [42] |
| Scheme-I route | ISI, about 1 or 4 months | FMCS, about 6 months | [5][6] |
How long does a BIS licence last once granted?
A CRS licence now lasts up to five years, renewable for up to five more, with fees paid every year. After the 25 February 2026 amendment, a CRS licence is granted initially for up to five years and renewed for up to five more, with fees paid annually in advance[7]. Missing the yearly fee and production statement suspends the licence for 90 days; a Rs 5,000 late fee within that window lifts it, otherwise it is cancelled[43]. Renewal should be applied for before three months of validity remain[8]; if it is late, a Rs 5,000 late fee applies and the licence expires 90 days after the validity date[8].
Scheme-I (ISI) licences now follow the same pattern: up to five years at first, renewable for up to five more, with fees paid yearly in advance[43]. Adding models to a CRS licence later is done by inclusion, which goes through the same test-report route[17]. A supplementary report adding series models must be submitted within 90 days of its issue[18]. Our CRS renewal guide and the licence renewal date tool help you diary these dates.
How does BIS compare with the other approvals you need?
BIS is usually the longest; most other approvals run in days or weeks and can be done in parallel. Plan these alongside BIS:
| Approval | Official timing | Source |
|---|---|---|
| WPC ETA (self-declaration) | Certificate downloaded on submission | [44] |
| MTCTE (SCS / GCS) | Normally 15 working days / 4-8 weeks | [45] |
| BEE star label | Scrutiny within 30 working days | [46] |
| Battery EPR | Two weeks, then deemed registered | [47] |
| Plastic EPR | 15 days, then deemed registration | [48] |
| E-waste EPR | Shortcomings flagged within 25 working days | [49] |
| LMPC registration | Incomplete applications returned within 7 working days | [50] |
Can a consultant make BIS registration faster?
A consultant can cut preparation time and query rounds, but cannot change BIS's processing or a lab's queue. BIS's own 20-working-day figure is conditional on a complete, conforming file[1], and testing time depends on the lab[2], so be wary of guaranteed dates. One consultancy's page for wireless headphones reportedly quotes 20-25 days to registration alongside its fees[51]; treat that as a target, not a promise.
Where a consultant genuinely helps is the paperwork that causes queries: matching factory names across documents, the AIR nomination and brand authorisations[20]. Read how to choose a BIS consultant, browse the BIS consultants directory, or ask us for a free compliance check to see what your file is missing.
How should you plan around BIS timelines?
Start BIS first and in parallel with everything else, and book launches against the grant date, not the target. Every other approval can be done while the lab works. Do not book shipping or marketplace launches against BIS's 20-working-day target; book them against the date the licence is actually granted. Importing finished goods before the licence is not an option for CRS products, because Customs checks BIS registration on arrival[52]. For a new CRS category, the date the consignment lands in India decides whether the requirement applies[53], so ship with margin before an enforcement date.
Use the BIS CRS application checklist to keep the file moving, the CRS fee calculator to budget, and the QCO deadline checker to see upcoming dates. If you are importing from China for the first time, our China electronics import guide puts BIS in the wider sequence.
Frequently asked questions
How many days does BIS take to issue a CRS licence?
How long does BIS lab testing take?
How long does an ISI mark licence take?
How long does FMCS take for a foreign factory?
What is the most common cause of delay?
Can a consultant guarantee a BIS licence in a fixed time?
Can components and the finished product be tested at the same time?
Yes. Parallel testing has been a permanent, voluntary option for all CRO 2021 categories since 9 January 2024, but BIS grants licences in sequence and the manufacturer bears the risk if a component fails[13].
Do I get my fees back if BIS rejects the application?
Not if it is rejected after processing because of unsatisfactory replies. A withdrawal within 24 hours of submission or before processing is refunded minus the application fee and taxes[19].
How long is a CRS licence valid?
Five years initially, renewable for five more, with fees paid annually, after the February 2026 amendment[7].
How long does adding a model to an existing licence take?
Inclusion uses the same route: a new test request, a lab report and an online application[17]. We have no separate official timeline for it.
My goods were shipped before a new CRS category took effect. Do they need registration?
For goods made overseas, the CRS FAQ says the date the consignment lands in India decides it: goods landing on or after the due date must comply, while goods imported before it are grandfathered[53]. Ship with a safety margin before any enforcement date.
Sources 53 documents, 50 official
Each number in the text links to the document below. Labels show the type of source; see our editorial policy.
- Official circular Guidelines for Grant of Licence (GoL) under Scheme-II of Schedule-II, BIS (Conformity Assessment) Regulations 2018, Ref RG:01 · 20 August 2019
- Official portal CRS Frequently Asked Questions (modified as on 28.09.2022), Q17 · 28 September 2022
- Official portal Registration - crsbis.in
- Official circular BIS Laboratory Recognition Scheme, 2020 (DOC: BIS/LRS/2020) · 23 June 2020
- Official portal BIS Product Certification FAQ
- Official portal Grant of Licence - BIS FMCS · 14 January 2021
- Official circular BIS notice: Revised Provisions for Licence Validity, Renewal and Annual Fee Payment under CRS (circular dated 27 May 2026) · 27 May 2026
- Official circular Guidelines for Renewal of Licence (RoL) under Scheme-II, Ref RG:03 · 20 August 2019
- Official portal Nomination of AIR - BIS FMCS · 5 February 2026
- Official portal Procedure for filing Form I under Smart Registration v1.0
- Official portal BIS LIMS - Lab details by IS number (IS 13252) · 1 November 2026
- Official portal BIS LIMS - Lab details by IS number (IS 16046) · 1 November 2026
- Official circular Guidelines for implementation of Parallel Testing (Registration/Guidelines RG:01) · 9 January 2024
- Official circular Regarding Test Reports and Document submitted by applicant for grant of registration / inclusion (Registration/G-14:3) · 1 October 2020
- Official circular Regarding Test Reports and documents submitted by applicant for grant of licence/inclusions - Amendment (Registration/G-14:3) · 8 March 2022
- Official portal CRS Frequently Asked Questions (modified as on 28.09.2022), Q10 · 28 September 2022
- Official portal Inclusion and Renewal - crsbis.in
- Official circular Guidelines for Grant of Licence (GoL) under Scheme-II, Ref RG:01 · 20 August 2019
- Official circular Guidelines for refund of fee under Scheme-II (Registration/CRS (E & IT Goods)) · 9 May 2023
- Official circular Frequently Observed Deficiencies in Applications (Registration/CRS(E&IT Goods)) · 4 February 2016
- Official circular Frequently Observed Deficiencies in Applications · 4 February 2016
- Official portal Products under CRS - crsbis.in (Products BIS list)
- Official portal CRS Checklist: Documents to be submitted with application for Registration
- Gazette BIS Registration Dept circular 06.09.2019 on marking + Scheme-II para 6 and Annexures I-III (Gazette extract) + e-labelling circular 13.09.2017 · 4 June 2018
- Official circular Advisory for applicants for Grant of Licence under CRS · 15 January 2025
- Official circular Guidelines for verification of rated capacity for portable sealed secondary Lithium Cells and Batteries · 10 February 2026
- Official portal crsbis.in What's New circular listNot yet confirmed officially
- Gazette MeitY S.O. 4182(E) · 26 July 2026
- Official circular BIS circular IS 16102 (Part 1)/02 dated 31 July 2026 · 31 July 2026
- Gazette MeitY S.O. 5689(E) · 16 October 2026
- Gazette MeitY S.O. 5190(E) · 21 September 2026
- Official portal BIS CRS portal - Standard Number(s) list (product category vs IS number)
- Official circular BIS Guidelines for Implementation of Migration to IS/IEC 62368-1:2023 (9 Mar 2026) · 9 March 2026
- Official circular BIS FAQs on Migration to IS/IEC 62368-1:2023 (22 Jul 2026) · 22 July 2026
- Official circular Guidelines for Implementation of Migration to IS/IEC 62368-1:2023 (Reg/IS/IEC 62368-1:2023/Guidelines/01) · 9 March 2026
- Official circular FAQs on Migration to IS/IEC 62368-1:2023 · 22 July 2026
- Official portal Manakonline: user manual of product certification (normal procedure)
- Official portal BIS List of fee to be charged from applicant/licensee under FMCS
- Official portal BIS FMCS: Frequently Asked Questions
- Official portal How to apply - BIS FMCS · 12 May 2026
- Official circular BIS circular: In-house laboratory requirement for manufacturers operating BIS product certification · 16 December 2025
- Official portal CRS Frequently Asked Questions (modified as on 28.09.2022), Q35 · 28 September 2022
- Gazette Gazette of India Extraordinary No. 142 (25 Feb 2026): BIS (Conformity Assessment) Amendment Regulations, 2026, F. No. BS/XI/11/01/2025-26 · 25 February 2026
- Official circular DoT WPC OM No. R-11017/01/2018-PP(part-1) dated 09.09.2024 - Issuance of ETA for License-Exempt Wireless Equipment Devices · 9 September 2024
- Official portal TEC 93009:2024 - MTCTE Procedure v3.0 (with TEC notification 1-2/2024-TC/TEC dated 01.01.2025 amending clauses) · 1 January 2025
- Gazette Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026 - Notification No. 5506/BEE/S&L/AL/2025-26 dated 26 Dec 2025, Gazette of India Extraordinary Part III Sec 4 (CG-DL-E-29122025-268894) · 26 December 2025
- Gazette Battery Waste Management (Amendment) Rules, 2023 - S.O. 4669(E) · 25 October 2023
- Official portal CPCB SOP for Registration of Producer, Importer & Brand Owners through Plastic EPR Portal (15 Mar 2022) · 15 March 2022
- Official circular CPCB SOP for grant of registration to Producers under E-Waste (Management) Rules, 2022 (April 2023; copy hosted by Pollution Control Board Assam) · 1 April 2023
- Official portal The Legal Metrology (Packaged Commodities) Rules, 2011 (G.S.R. 202(E), 7 March 2011) - copy hosted by Directorate of Legal Metrology, West Bengal · 7 March 2011
- Reported BIS CRS Certification for Wireless Headphone: Fee, Documents, Process (Professional Utilities) · 31 October 2026Not yet confirmed officially
- Reported CBIC Instruction F.No. 401/67/2023-Cus-III dated 12.12.2023 (signed copy hosted by LiveLaw); number 28/2023 per TaxGuru · 12 December 2023Not yet confirmed officially
- Official portal CRS Frequently Asked Questions (modified as on 28.09.2022), Q1-Q3 · 28 September 2022