What it costs to get an electronics product compliant for import into India: every official fee, two worked examples and the costs nobody publishes

For one new Bluetooth earphone model and one power bank model, the official fees add up to Rs 84,500 before GST in year one: two BIS CRS registrations, a WPC ETA, LMPC and battery and plastic EPR. With lab tests and consultants, expect roughly Rs 2.5 lakh to Rs 2.7 lakh.

Each extra CRS test report
Rs 20,000
WPC ETA (self-declaration)
Rs 10,000 per model
LMPC importer registration
Rs 500
On this page
  1. Key facts
  2. How much does it cost to import electronics into India legally?
  3. What are the official fees for each approval?
  4. How much does BIS CRS cost for an electronics product?
  5. How much do WPC ETA and MTCTE cost?
  6. How much does LMPC importer registration cost?
  7. How much does EPR cost for an electronics importer?
  8. What do EPR certificates cost? The official floor prices
  9. What to watch with certificate prices
  10. Worked example: one Bluetooth earphone model and one power bank model
  11. How the worked example changes
  12. Which other electronics add more approvals?
  13. Does the country of origin change the cost?
  14. Which costs are not government fees, and what do they run to?
  15. What does it cost all-in? Small, medium and complex worked totals
  16. What the all-in totals assume
  17. How does GST apply to compliance costs?
  18. What does it cost if you skip a step or get one wrong?
  19. In what order should you pay for import approvals?
  20. Frequently asked questions
  21. Sources

Key facts at a glance

BIS CRS new licence, one test report, year one
Rs 1,000 + Rs 1,000 + Rs 25,000 = Rs 27,000 before GST[1]
Each extra CRS test report
Rs 20,000[1]
GST on BIS fees
Charged on every CRS payment[2]
WPC ETA (self-declaration)
Rs 10,000 per model[3]
LMPC importer registration
Rs 500[4]
Battery EPR registration
Rs 10,000 (turnover under Rs 5 crore)[5]
Plastic EPR registration
Rs 10,000 (under 1,000 TPA)[6]
Plastic EPR annual processing fee
25% of the application fee[6]
E-waste EPR, new producer
Rs 10,000, plus Rs 5,000 annual maintenance[7]
MTCTE administrative fee
Rs 10,000 to Rs 50,000 by product group[8]
2026 BIS amendment
Gazette No. 142, 25 Feb 2026: CRS processing Rs 25,000 a year[1]

Checked 2 November 2026 against the regulator's own documents.

How much does it cost to import electronics into India legally?

There is no single fee. You pay several regulators, and the mix depends on the product:

  1. BIS CRS registration for products on the Compulsory Registration Order. Covered goods cannot be imported, sold or stored for sale without the Standard Mark and a BIS registration number[9].
  2. WPC Equipment Type Approval (ETA) for wireless products in licence-exempt bands[3].
  3. MTCTE certification from TEC, for notified telecom equipment such as Wi-Fi access points and routers[10].
  4. LMPC importer registration under the Legal Metrology (Packaged Commodities) Rules[4].
  5. EPR registration with CPCB for batteries, plastic packaging and, for listed equipment, e-waste. Each has its own fee and its own yearly obligations[11].
  6. EPR certificates, which you buy each year to meet your targets. CPCB sets a price band for these, but the actual price is agreed privately.
  7. Private charges: labs, the Authorised Indian Representative (AIR), consultants, label printing and your customs broker. These are not government fees. Where BIS publishes labs' declared charges, or a firm publishes its price, the cost pages quote them and say so.

Below we add up the fees we can cite and work two examples. Each approval has its own cost page: BIS CRS cost, WPC ETA cost, MTCTE cost, LMPC cost and EPR registration cost. To add them up for your own product, use the compliance cost estimator; for the raw fee tables, see India compliance fees 2026.

What are the official fees for each approval?

All figures below are the published government fees. Read the source column: each fee comes from the regulator's own rules or fee table, and we flag in the sections that follow where a table is old or a figure is only reported.

Official fees an electronics importer may pay (excluding private charges)
ApprovalWho it applies toOfficial feeRecurringSource
BIS CRS registrationThe manufacturer (factory) of a CRS-listed productApplication Rs 1,000; processing Rs 25,000 a year, paid in advance; Rs 20,000 per extra report; GST on topProcessing Rs 25,000 and annual licence fee Rs 1,000 every year[1][2]
BIS CRS inclusion (adding models)An existing CRS licence holderRs 30,000 per application, plus Rs 20,000 per extra reportNone[1]
WPC ETA (self-declaration)Wireless products in licence-exempt bandsRs 10,000 per modelNone: valid for the model's lifetime unless revoked[3]
MTCTE certificateNotified telecom equipmentGroup A Rs 10,000, B Rs 20,000, C Rs 30,000, D Rs 50,000None; regular certificate normally valid ten years[8]
LMPC importer registrationAnyone who imports pre-packed commodities for saleRs 500Rs 100 per alteration; certificate valid until cancelled[4][12]
Battery EPR registrationImporters of batteries or equipment containing batteriesRs 10,000 (turnover under Rs 5 crore), Rs 20,000 (Rs 5-50 crore), Rs 40,000 (over Rs 50 crore)None found; certificate valid until cancelled[5][13]
Plastic EPR registrationImporters of products in plastic packagingRs 10,000 (under 1,000 TPA), Rs 20,000 (1,000-10,000 TPA), Rs 50,000 (over 10,000 TPA)25% of the application fee with each annual return[6]
E-waste EPR registrationProducers of EEE listed in Schedule IRs 10,000 for producers whose sales have just started; otherwise Rs 2,500 to Rs 15,00,000 by recycling targetRs 5,000 annual maintenance[7]
BEE star labelSchedule A appliances such as LED lamps and TVsRs 5,000 company registration, Rs 5,000 per model, Rs 3 lakh label security deposit per applianceLabel fee by quantity sold, paid quarterly[14][15][14]

How much does BIS CRS cost for an electronics product?

Since 25 February 2026, a new CRS application costs an application fee of Rs 1,000[1], an annual licence fee of Rs 1,000[1] and a processing fee of Rs 25,000 a year, paid in advance[1]. That is Rs 27,000 before GST in year one and Rs 26,000 in each later year (our addition). Each additional test report is Rs 20,000[1], and GST is charged on all of it[2].

Three rules decide how many times you pay this:

  • One licence per factory. The applicant is the manufacturer, and the licence is granted per manufacturing unit, not to an importer or trader[9]. Two factories means two licences.
  • One application per brand, unless the brand owner is the same[16].
  • One licence per product category. BIS guidance says a separate licence is needed for each product name[17]. Earphones and power banks are different CRS categories[18], so they need separate licences even from the same factory.

The 2018 fee table has been replaced. The BIS (Conformity Assessment) Amendment Regulations, 2026 were notified in Gazette No. 142 on 25 February 2026[1]. CRS licences are now granted for up to five years with fees paid annually in advance[19], and the one-time Rs 50,000 processing fee of the 2018 table[2] became Rs 25,000 a year. The fee PDF on crsbis.in still shows the old table, so expect older quotes to use it. Miss a yearly payment and the licence is suspended for 90 days until you pay with a Rs 5,000 late fee[1].

Indian MSMEs get a processing fee concession: 80% for micro enterprises and start-ups, 50% for small and 20% for medium enterprises until 31 May 2029, then 20% for all MSMEs[1]. It applies to the manufacturer, so a factory abroad does not get it. A foreign factory applying directly also needs an AIR in India[16]; the published fee structure has no separate fee to nominate one, and BIS charges Rs 5,000 to change one[2]. Model your own CRS numbers with the CRS fee calculator.

How much do WPC ETA and MTCTE cost?

WPC ETA. Wireless devices in licence-exempt bands get Equipment Type Approval by self-declaration on the Saral Sanchar portal[20]. The fee is Rs 10,000 per model, paid through Bharat Kosh[3]. You need an RF test report, the manufacturer's authorisation if you apply as its Indian representative, and technical literature[3]. There is no renewal fee: the ETA is valid for the model's lifetime unless WPC revokes it[3].

Which products need it:

  • Bluetooth earphones use the licence-exempt 2.4 GHz band, so they are likely to need an ETA by self-declaration[21].
  • On our reading, plain power banks have no radio and need no ETA; power banks with wireless (Qi) charging or Bluetooth may need one[21].
  • Bluetooth speakers[21], smartwatches with Bluetooth or Wi-Fi[21] and Wi-Fi routers[21] are likely to need an ETA too.

MTCTE. Only notified telecom equipment needs a TEC certificate. Since 1 January 2024, only the administrative fee is charged for these applications[22]. It is Rs 10,000 for Group A, Rs 20,000 for Group B, Rs 30,000 for Group C and Rs 50,000 for Group D[8]. Equipment working in 2.4/5 GHz is Group B and routers are Group C[8]. On our reading of TEC's list of notified products, earphones and power banks are not on it[10], and smartwatches and mobile handsets are exempt from prior MTCTE[23]. Selling notified equipment without a certificate costs ten times the normal fee to fix[8].

How much does LMPC importer registration cost?

Anyone who imports a commodity in pre-packed form for sale must register their name and address with the Legal Metrology authority[4]. The application goes to the Director of Legal Metrology or the State Controller[4], with a fee of Rs 500[4]. Each later alteration to the certificate costs Rs 100[4].

You must apply within 90 days of starting to import[4]. Since 2026 the certificate is valid until cancelled[12], but the rules now require you to update your details on the portal every year, including the products and numbers you imported, once the portal option is live[12]. One registration covers you as importer and lists the commodities you import[4], so it is not a per-model cost.

How much does EPR cost for an electronics importer?

Batteries. Anyone who imports equipment containing batteries is a producer under the Battery Waste Management Rules[13]. That covers TWS earbuds and their charging cases[24] and power banks[24]. CPCB's FAQ says importers must register before importing[25]. The application fee is Rs 10,000 below Rs 5 crore turnover, Rs 20,000 for Rs 5-50 crore and Rs 40,000 above Rs 50 crore[5]. That SOP's cover date predates the rules, so treat it as the latest schedule we found rather than settled.

Plastic packaging. If your product comes in plastic packaging, you are an importer under the plastic EPR guidelines[26]. The application fee is Rs 10,000 under 1,000 tonnes a year[6], and you pay 25% of it each year with your annual return[6]. A fresh registration lasts one year and a renewed one three years[6].

E-waste. Registration is needed for EEE listed in Schedule I[27]. Schedule I does not name earphones or power banks separately; their coverage depends on generic entries[11]. Earphones may fall under CEEW13[27], and the coverage of power banks is unclear[27]. The battery inside is a separate battery EPR obligation either way[11]. If e-waste registration applies, a producer whose sales have just started pays Rs 10,000[7] plus Rs 5,000 a year in annual maintenance[7].

The full fee story is on our EPR registration cost page.

What do EPR certificates cost? The official floor prices

Meeting your yearly EPR target means buying certificates from registered recyclers or processors. The price is negotiated, but CPCB fixes a band: 30% to 100% of the environmental compensation (EC) for not meeting the target, for e-waste[28], batteries[29] and plastic[30].

Targets are set against what you placed on the market in earlier years. For rechargeable consumer-electronics batteries, the target from 2024-25 is 70% of what was placed on the market five years earlier[31]. For e-waste producers with a short sales history, it is 20% of sales two financial years earlier from 2025-26[11]. Your target appears on the portal; check it before you budget.

Official EC and certificate price bands relevant to earphones and power banks
StreamUnitEC (ceiling)Floor priceSource
Battery, Li-ion: lithium recoveredper kg of metalRs 2,400Rs 720[32]
Battery, Li-ion: cobalt, nickel, manganeseper kg of metalRs 555Rs 166[32]
Battery, Li-ion: copperper kg of metalRs 270Rs 81[32]
Battery, Li-ion: aluminium, ironper kg of metalRs 120Rs 36[32]
E-waste, CEEW (consumer electronics)per kgRs 74Rs 22[33]
E-waste, ITEW (IT and telecom)per kgRs 112Rs 34[33]
Plastic, Category I (rigid)per tonneRs 2,900Rs 870 (our arithmetic: 30%)[34][30]
Plastic, Category II (flexible, pouches)per tonneRs 5,000Rs 1,500 (our arithmetic: 30%)[34][30]
Plastic, Category III (multilayer)per tonneRs 7,900Rs 2,370 (our arithmetic: 30%)[34][30]

What to watch with certificate prices

  • The e-waste floor is not settled. The copy of CPCB's e-waste EC guidelines we read is dated August 2024, and industry has reportedly challenged the floor price in court[33].
  • Battery figures are per kg of recovered metal, not per kg of battery. We cannot turn them into a per-unit cost for a power bank without the recovery data, so we do not.
  • Certificates expire. Battery certificates are valid seven years[31]; e-waste certificates two years from the end of the financial year they were generated[11].

Worked example: one Bluetooth earphone model and one power bank model

This is our arithmetic on the official figures above, not a quote. The assumptions:

  • A new Indian importer, turnover under Rs 5 crore, plastic packaging well under 1,000 tonnes a year.
  • One TWS earphone model and one plain power bank model (no wireless charging, no Bluetooth), each from a foreign factory that holds no CRS licence yet, under the importer's brand.
  • Each model is covered by one test report, and no MSME concession applies.
  • The 2026 CRS fee schedule, for year one; GST not added because its rate is not stated in the fee schedule.

Why each line is there: earphones are CRS-listed[18] and are likely to need a WPC ETA[21]; power banks are CRS-listed[18]; both contain lithium batteries[24] and come in plastic packaging[26]; neither appears to need MTCTE[10] or a BEE label[35].

First-year official fees for one earphone model and one power bank model (our arithmetic; excludes GST, certificates and private charges)
ItemEarphone modelPower bank modelImporter, onceSource
CRS application feeRs 1,000Rs 1,000-[1]
CRS annual licence fee (year one)Rs 1,000Rs 1,000-[1]
CRS processing fee (year one, in advance)Rs 25,000Rs 25,000-[1]
WPC ETARs 10,000Likely not needed (no radio)-[3][21]
LMPC importer registration--Rs 500[4]
Battery EPR registration--Rs 10,000[5]
Plastic EPR registration--Rs 10,000[6]
SubtotalRs 37,000Rs 27,000Rs 20,500
First-year totalRs 84,500
If e-waste registration applies (new producer)+ Rs 10,000 = Rs 94,500[7]

How the worked example changes

  • Second year onwards. Per year, expect the CRS processing fee of Rs 25,000 and annual licence fee of Rs 1,000 per licence, paid in advance[1], so Rs 52,000 for the two licences here, the plastic annual processing fee of 25% of Rs 10,000, which is Rs 2,500[6], and Rs 5,000 e-waste maintenance if you are registered for e-waste[7]. Then add certificates once targets apply.
  • Compared with the 2018 table. Under the old one-time Rs 50,000 processing fee[2], each licence cost Rs 52,000 in year one, Rs 25,000 more than now, but the yearly processing fee means a five-year licence[19] costs about the same in total, Rs 1,31,000 per licence on the 2026 schedule[1].
  • An Indian MSME factory. A micro enterprise or start-up pays Rs 5,000 a year in processing instead of Rs 25,000 until 31 May 2029[1].
  • Five colours of the same earphone. Series models can be covered through supplementary reports referring to an accepted original report[16]. If the lab needs a second full report, add Rs 20,000[1].
  • A power bank with wireless charging. It may then need its own ETA[21]: add Rs 10,000.
  • A second brand. A new CRS application with its own yearly fees, unless the brand owner is the same[16].

Which other electronics add more approvals?

Other products pull in more regulators:

Extra official approvals for common electronics
ProductWhat else appliesOfficial fee basisSource
Wi-Fi routerLikely WPC ETA, and MTCTE; not a CRS category, but its power adaptor isETA Rs 10,000 per model; MTCTE Group C Rs 30,000[36][21][3][10][8]
LED bulbCRS and the mandatory BEE star labelBEE label fee Rs 10 per 100 pieces, plus registration and deposit[36][15][14]
LaptopCRS, likely WPC ETA, battery and e-waste EPR (ITEW3)As in the main fee table[36][21][13][27]
Mobile phoneCRS with Indian language standard, likely ETA; exempt from prior MTCTEAs in the main fee table[36][21][23]
Extension boardLikely the ISI mark under the plugs and sockets QCO, not CRSScheme-I fees, including inspection at Rs 7,000 per man-day[37][38]

Does the country of origin change the cost?

The Indian fees do not change with the country of origin; the same BIS, WPC, LMPC and EPR tables apply. What changes is practical: whether the factory already holds Indian registrations, how far samples travel, and for MTCTE, whether a lab abroad can be used at all, since foreign labs cannot be recognised in a country that shares a land border with India[39]. For China-specific practice, see importing from China and how to import electronics from China to India. For a second opinion on your product list before you pay any lab, ask for a free compliance check.

Which costs are not government fees, and what do they run to?

No regulator sets these, but most of them now have a visible market price. BIS-recognised labs declare their CRS testing charges on BIS LIMS[40]; MTCTE labs must publish theirs[41]; consultants advertise theirs. Figures marked "reported" come from vendors and are not official. Lab lists are on BIS labs in Delhi NCR; consultants on BIS consultants, WPC consultants, LMPC consultants and EPR consultants.

Private charges and what the official rules say about them
CostTypical figureWhat the rules requireSource
CRS safety testingIS 13252: Rs 25,000 to Rs 2,00,000, median about Rs 63,750 (declared on LIMS)A BIS-recognised lab; report under 90 days old when BIS receives the application[40][16]
Battery testing (IS 16046)Rs 37,500 to Rs 4,80,000, median about Rs 80,000 (LIMS)Cells and packs inside many products are registered separately[42]
RF test report for ETAReported Rs 15,000 to Rs 40,000 per modelFrom an accredited laboratory, named in your self-declaration[43][44]
MTCTE lab testingOne lab lists Rs 85,000 for a routerA TEC-designated lab[45]
Authorised Indian RepresentativeSet privatelyNeeded by foreign CRS applicants; an Indian resident responsible for compliance[16][46]
Affidavit stamp paperRs 100 (official)The CRS affidavit is on Rs 100 non-judicial stamp paper, notarised[47]
CRS consultantReported Rs 14,999, plus Rs 10,000 for foreign or non-MSME applicantsNot required by BIS[48]
WPC consultantReported Rs 7,000 to Rs 12,000Not required[49]
LMPC consultantReported Rs 4,999 (Rs 9,999 urgent)Not required[50]
EPR consultant or PROReported Rs 5,000 for e-waste registrationUsing a PRO does not move e-waste EPR liability off you[51][11]
EPR certificatesBand only (30-100% of EC)Bought from registered recyclers or processors[29][28]
Label printing and relabellingSet privatelyDeclarations must be on the package before goods leave an AEO Tier-2/3 bonded warehouse, if you use that route[12]

What does it cost all-in? Small, medium and complex worked totals

These add the official fees to the median declared lab charges and the reported consultant prices above. They are our arithmetic, before GST, freight, duty and EPR certificates.

  • Small: an Indian importer brings in one plain power bank model from a factory that already holds a valid CRS registration covering it. The importer pays only for its own registrations and uses consultants for LMPC and EPR.
  • Medium: the worked example above (one Bluetooth earphone model, one power bank model, new CRS for both), plus labs and consultants.
  • Complex: a new laptop brand with three models from one factory needing three CRS reports and three ETAs, registered for battery, plastic and e-waste EPR.
All-in first-year cost, before GST (our arithmetic on official, LIMS and reported figures)
LineSmallMediumComplex
BIS CRS fees, year oneRs 0 (factory already registered)Rs 54,000 (two licences)[1]Rs 67,000 (one licence, three reports)[1]
CRS lab testsRs 0Rs 63,750 (power bank, LIMS median) + Rs 25,000 (earphone, reported)[40][52]3 x Rs 63,750 = Rs 1,91,250[40]
WPC ETA feeRs 0Rs 10,000[3]3 x Rs 10,000 = Rs 30,000[21]
RF testing (reported)Rs 0Rs 15,000-40,000[43]Rs 45,000-1,20,000
LMPC + EPR registrationsRs 20,500Rs 20,500Rs 35,500 (adds e-waste Rs 10,000 + Rs 5,000)[7]
Consultants (reported)LMPC Rs 4,999 + EPR Rs 5,000 = Rs 9,999CRS 2 x Rs 24,999 + WPC Rs 7,500 = Rs 57,498CRS Rs 24,999 + WPC 3 x Rs 7,500 = Rs 47,499
Total before GST and certificatesRs 30,499Rs 2,45,748-2,70,748Rs 4,16,249-4,91,249

What the all-in totals assume

  • The small case is cheap because the factory already holds CRS. Registration belongs to the manufacturing unit[9], so buying from a registered factory, under its registered brand or with your brand added, saves the biggest line. Check the R-number and model list before you order.
  • Consultant lines use one firm's published CRS fee of Rs 14,999 plus Rs 10,000 for foreign applicants[48], the Rs 7,500 WPC fee[49], the Rs 4,999 LMPC fee[50] and the Rs 5,000 EPR fee[51]. Doing the filings yourself removes them.
  • The earphone lab line uses one consultancy's published Rs 25,000 for wireless headphones[52], because we have no LIMS figure for IS 616.
  • Laptops need ETA where they have Wi-Fi or Bluetooth[21], and they are e-waste code ITEW3[27].
  • Not included: customs duty, freight, AIR fees, sample shipping and EPR certificates.

How does GST apply to compliance costs?

Assume GST on top of almost every line. BIS CRS amounts exclude tax and GST is charged on every payment[2]; a sample BIS invoice indexed online shows 18%[53]. Lab charges on LIMS are declared excluding taxes[40], MTCTE lab prices exclude taxes[45], and consultants quote plus GST[49]. One LMPC consultant shows its Rs 5,499 package as Rs 6,489 including GST[54], which is 18% on our arithmetic.

At 18%, the medium case above rises from about Rs 2.46-2.71 lakh to about Rs 2.90-3.19 lakh. We have no official source for GST on the WPC, MTCTE and LMPC government fees, so check each payment screen. A GST-registered importer can usually claim input credit; confirm with your accountant.

What does it cost if you skip a step or get one wrong?

Skipping an approval rarely saves money.

  • BIS. Importing CRS goods without a valid licence and Standard Mark is punishable with imprisonment up to two years, or a fine of at least Rs 2 lakh for a first contravention and at least Rs 5 lakh after that, extendable to ten times the value of the goods[55]. The BIS Act counts importers as persons bound by the rule[55].
  • Legal Metrology. Selling or importing a package without the required declarations draws an improvement notice for a first offence, a penalty of up to Rs 5 lakh for a second, and Rs 25-50 lakh after that[56].
  • MTCTE. Uncertified notified equipment can be certified within 180 days at ten times the normal fee[39].
  • EPR. For battery-rule breaches other than a target shortfall, such as not filing returns, EC is Rs 20,000, Rs 40,000 and Rs 80,000 for the first three defaults[32]. E-waste producers face the same three figures[33].
  • At the port. Under a 2023 CBIC instruction, as reported, customs checks BIS registration for every consignment of CRS goods, tests random samples before out of charge, and failing goods may be sent back or destroyed at the importer's cost[57]. CPCB has asked Customs to check battery EPR registration too[58]. A customs penalty for goods under a prohibition can reach their full value or Rs 5,000, whichever is greater[59]; where the problem is duty rather than a prohibition, the cap is 10% of the duty evaded or Rs 5,000, whichever is higher[60].
  • Storage and paperwork. While goods wait, one Mundra CFS charges ground rent of Rs 405 a day for a 20-foot container from day four, rising to Rs 2,610 a day by day 27[61], about Rs 37,760 over 30 days on our arithmetic, before shipping-line demurrage. Examining a container costs Rs 3,600 or more in handling at the same CFS[61]. Filing the bill of entry late costs Rs 5,000 a day for three days and Rs 10,000 a day after that[62].

More in why shipments get held at Indian ports and the customs clearance documents checklist. For the step-by-step order of doing all this, see our first electronics import checklist.

In what order should you pay for import approvals?

Spend in the order that avoids paying twice. The factory-side approvals take longest, so they start first; the importer's own registrations are quick but must be in place before the first shipment.

  1. 1
    Check what applies

    Run each product through the approval checker and confirm the CRS category, radios and battery.

  2. 2
    Ask the factory for its registrations

    If it already holds CRS for the model, you may only need your brand added; registration is per manufacturing unit[9].

  3. 3
    Book CRS testing

    Generate the test request and send samples to a recognised lab within 60 days[63]; compare declared charges first.

  4. 4
    Get the RF report and file the ETA

    Pay Rs 10,000 per model on Saral Sanchar[3]. Import samples under the testing exemption[64].

  5. 5
    Register LMPC and EPR

    LMPC within 90 days of starting imports[4]; battery EPR before importing[25].

  6. 6
    Fix labels and ship

    Print the Standard Mark with the R-number and the LMPC declarations before dispatch, then file the bill of entry on time.

Frequently asked questions

What is the minimum government fee to import Bluetooth earphones into India?

If the factory needs a new CRS licence, the BIS fees are Rs 27,000 before GST for one test report in year one, then Rs 26,000 a year[1]. A WPC ETA adds Rs 10,000 per model[3]. You also need LMPC registration at Rs 500[4] and battery and plastic EPR registration[5][6].

Does a power bank need WPC approval?

On our reading, a plain power bank has no radio and needs no ETA. Power banks with wireless (Qi) charging or Bluetooth may need one[21], at Rs 10,000 per model[3].

Do I pay BIS fees again for every model?

Not necessarily. Each test report beyond the first in an application costs Rs 20,000[1]. Series models can be added through supplementary reports[16]. Adding models to an existing licence later costs Rs 30,000 including one report[1].

Is GST charged on these fees?

On BIS CRS fees, yes: all amounts exclude tax and GST is charged on every payment[2]. Our sources do not state GST treatment for the other fees, so check the payment screen on each portal.

How much does LMPC registration cost for an importer?

Rs 500 with the application[4], and Rs 100 for each alteration[4]. Apply within 90 days of starting to import[4].

Are EPR certificate prices fixed by the government?

Only the band is. CPCB fixes the highest and lowest prices at 100% and 30% of the environmental compensation[29][28]. The actual price is agreed with the recycler.

What do labs and consultants charge?

These are not government fees, so there is no official figure. The rules only fix who can test: for CRS, a BIS-recognised lab[16]; for ETA, an accredited lab[44]. Get written quotes.

Will BIS fees change in 2026?

Yes, they changed on 25 February 2026. CRS licences now run for up to five years with fees paid annually[19], and the processing fee is Rs 25,000 a year instead of Rs 50,000 once[1][2]. Year one is cheaper; over five years the total is about the same.

What is the all-in cost to import a new electronics product into India?

For one earphone and one power bank model, both needing new CRS, official fees are about Rs 84,500 in year one and the all-in figure with labs and consultants about Rs 2.46 lakh to Rs 2.71 lakh before GST, on our arithmetic. The biggest lines are the CRS processing fee[1] and lab tests[40].

Can I avoid CRS costs by buying from an already registered factory?

Often, yes. CRS registration belongs to the manufacturing unit, not the importer[9]. A separate application is needed for a new brand unless the brand owner is the same[16].

What happens if my shipment arrives before the approvals?

Customs can hold it and test it, and under a 2023 CBIC instruction, as reported, send back or destroy failing CRS goods at your cost[57], with a possible penalty of up to the goods' value[59]. Port storage keeps running meanwhile[61].

Sources 64 documents, 49 official

Each number in the text links to the document below. Labels show the type of source; see our editorial policy.

  1. Gazette Gazette of India Extraordinary No. 142 (25 Feb 2026): BIS (Conformity Assessment) Amendment Regulations, 2026, F. No. BS/XI/11/01/2025-26 · 25 February 2026
  2. Official portal BIS CRS Fee Structure (applicable w.e.f. 04 June 2018) · 4 June 2018
  3. Official portal Equipment Type Approval (ETA) - DoT eServices Portal (last updated 28-05-2025) · 28 May 2025
  4. Official portal The Legal Metrology (Packaged Commodities) Rules, 2011 (G.S.R. 202(E), 7 March 2011) - copy hosted by Directorate of Legal Metrology, West Bengal · 7 March 2011
  5. Official portal CPCB SOP for Registration of Producers through the Online Portal under BWM Rules, 2022
  6. Official portal CPCB SOP for Registration of Producer, Importer & Brand Owners through Plastic EPR Portal (15 Mar 2022) · 15 March 2022
  7. Official circular CPCB SOP for grant of registration to Producers under E-Waste (Management) Rules, 2022 (April 2023; copy hosted by Pollution Control Board Assam) · 1 April 2023
  8. Official portal TEC 93009:2024 - MTCTE Procedure v3.0 (with TEC notification 1-2/2024-TC/TEC dated 01.01.2025 amending clauses) · 1 January 2025
  9. Official portal About CRS - crsbis.in
  10. Official circular TEC F.No. 5-2/2024-TC/TEC Amendment Notification with Annexure-I list of products notified under MTCTE and mandatory dates · 1 July 2024Not yet confirmed officially
  11. Gazette E-Waste (Management) Rules, 2022 - G.S.R. 801(E), Gazette of India (CPCB copy) · 2 November 2022
  12. Gazette G.S.R. 418(E), 29 May 2026 - Legal Metrology (Packaged Commodities) Third Amendment Rules, 2026 (Gazette of India, Extraordinary) · 29 May 2026
  13. Gazette Battery Waste Management (Amendment) Rules, 2023 - S.O. 4669(E) · 25 October 2023
  14. Gazette Bureau of Energy Efficiency (Appliance Labeling and Compliance) Regulations, 2026 - Notification No. 5506/BEE/S&L/AL/2025-26 dated 26 Dec 2025, Gazette of India Extraordinary Part III Sec 4 (CG-DL-E-29122025-268894) · 26 December 2025
  15. Official portal BEE - Self-ballasted LED Lamps notifications table
  16. Official circular Guidelines for Grant of Licence (GoL) under Scheme-II of Schedule-II, BIS (Conformity Assessment) Regulations 2018, Ref RG:01 · 20 August 2019
  17. Official circular BIS Registration Dept Ref Reg/2026/G-01: Guidance on product categories under CRS · 13 August 2026
  18. Official portal Products under CRS - crsbis.in (Products BIS list)
  19. Official circular BIS notice: Revised Provisions for Licence Validity, Renewal and Annual Fee Payment under CRS (circular dated 27 May 2026) · 27 May 2026
  20. Official circular DoT WPC OM No. R-11017/01/2018-PP(part-1) dated 09.09.2024 - Issuance of ETA for License-Exempt Wireless Equipment Devices · 9 September 2024
  21. Official circular DoT WPC OM R-11017/01/2018-PP(part-1): Issuance of ETA for License-Exempt Wireless Equipment Devices · 9 September 2024Not yet confirmed officially
  22. Official circular TEC Notification F No. 1-5/2022-TC/TEC dated 27.12.2023 - Re-categorization of notified products as GCS & SCS and reduction of fee for ER based applications w.e.f. 01.01.2024 · 27 December 2023
  23. Gazette DoT S.O. 2372(E): exemption of five categories from prior MTCTE · 24 May 2022
  24. Gazette Battery Waste Management Rules, 2022 (S.O. 3984(E)) · 22 August 2022
  25. Official portal CPCB FAQs (General) under Battery Waste Management Rules, 2022
  26. Gazette G.S.R. 133(E): Plastic Waste Management (Amendment) Rules 2022 - Guidelines on EPR for Plastic Packaging (copy hosted by TNPCB) · 16 February 2022
  27. Gazette E-Waste (Management) Rules, 2022 (G.S.R. 801(E)) incl. Schedule I · 2 November 2022Not yet confirmed officially
  28. Gazette E-Waste (Management) Amendment Rules, 2024 - G.S.R. 164(E) · 8 March 2024
  29. Gazette Battery Waste Management (Amendment) Rules, 2024 - G.S.R. 190(E) · 14 March 2024
  30. Gazette Plastic Waste Management (Amendment) Rules, 2024 - G.S.R. 201(E) (gazette copy hosted by TNPCB) · 14 March 2024
  31. Gazette Battery Waste Management Rules, 2022 - S.O. 3984(E), Gazette of India · 22 August 2022
  32. Official circular CPCB Notice (10 Sep 2024) enclosing Guidelines for Environment Compensation under BWM Rules, 2022 (August 2024) and MoEFCC concurrence of 9 Sep 2024 · 10 September 2024
  33. Official circular CPCB Guidelines for Environment Compensation (EC) under E-Waste (Management) Rules, 2022 (August 2024; copy hosted by TNPCB)
  34. Official circular CPCB Revised Guidelines for Assessment of Environment Compensation for Violation of PWM Rules, 2016 (August 2024)
  35. Official portal BEE Star Label portal - Voluntary Appliance list
  36. Official portal BIS CRS portal - Standard Number(s) list (product category vs IS number)
  37. Gazette DPIIT S.O. 2166(E): Plugs and Socket-Outlets and AC Direct Connected Static Prepayment Meters for Active Energy (Quality Control) Order, 2021 · 7 June 2021Not yet confirmed officially
  38. Official portal BIS Product Certification FAQ
  39. Gazette G.S.R. 315(E), 16 May 2025 - Telecommunications (Framework to Notify Standards, Conformity Assessment and Certification) Rules, 2025 (Gazette copy on DoT eServices) · 16 May 2025
  40. Official portal BIS LIMS - Lab details by IS number (IS 13252) · 1 November 2026
  41. Official circular TEC letter No. 5-2/2020-MRA/TEC: Display of testing charges by TEC designated CABs on their website · 29 September 2020
  42. Official portal BIS LIMS - Lab details by IS number (IS 16046) · 1 November 2026
  43. Reported WPC ETA approval for wireless equipment - Beacon Filing (21 March 2026, updated 11 June 2026) · 11 June 2026Not yet confirmed officially
  44. Official circular DoT WPC OM No. ETA-WPC/Policy/2018-19 dated 26.02.2019 - ETA through self-declaration for certain categories of Wireless Equipment in license exempt bands (with annexed self-declaration format) · 26 February 2019
  45. Reported Mandatory Testing & Certification of Telecommunication Equipment (MTCTE) - SGS India · 1 January 2025Not yet confirmed officially
  46. Official portal Nomination of AIR - BIS FMCS · 5 February 2026
  47. Official circular Advisory for applicants for Grant of Licence under CRS (circular 15 Jan 2025) · 15 January 2025
  48. Reported Professional Utilities: BIS CRS RegistrationNot yet confirmed officially
  49. Reported WPC ETA Certificate in India - Professional Utilities (modified 23 June 2025) · 23 June 2025Not yet confirmed officially
  50. Reported LMPC Certificate for Importers - Professional Utilities (updated 25 August 2026) · 25 August 2026Not yet confirmed officially
  51. Reported Professional Utilities: EPR Registration for E-wasteNot yet confirmed officially
  52. Reported BIS CRS Certification for Wireless Headphone: Fee, Documents, Process (Professional Utilities) · 31 October 2026Not yet confirmed officially
  53. Reported BIS tax invoice ZHMPWCZ05MNPL8 (seen in a search excerpt; file no longer online)Not yet confirmed officially
  54. Reported Professional Utilities: LMPC Certificate for ImporterNot yet confirmed officially
  55. Gazette The Bureau of Indian Standards Act, 2016 (Act No. 11 of 2016) · 21 March 2016
  56. Gazette The Jan Vishwas (Amendment of Provisions) Act, 2026 (No. 8 of 2026), Gazette of India Extraordinary Part II Sec 1, 8 April 2026 (CG-DL-E-08042026-271642), copy hosted on dgma.gov.in · 8 April 2026
  57. Reported CBIC Instruction F.No. 401/67/2023-Cus-III dated 12.12.2023 (signed copy hosted by LiveLaw); number 28/2023 per TaxGuru · 12 December 2023Not yet confirmed officially
  58. Official circular CPCB letter dated 23 Dec 2022 to CBIC on clearing battery import consignments · 23 December 2022
  59. Official circular Standing Order No. 01/2024, Office of the Principal Commissioner of Customs, Airport and Air Cargo Complex, Bengaluru (C.No. Gen/Rev/MISC.75/2024/Rev-AP&ACC), with corrigendum of 04.03.2024 · 29 February 2024
  60. Official circular Standing Order No. 01/2024, Office of the Principal Commissioner of Customs, Airport and Air Cargo Complex, Bengaluru · 29 February 2024
  61. Reported Saurashtra Freight Pvt Ltd CFS tariff w.e.f. 1st September 2026 · 1 September 2026Not yet confirmed officially
  62. Official circular JNCH Public Notice No. 85/2018 (23.05.2018) on the Bill of Entry (Electronic Integrated Declaration and Paperless Processing) Regulations, 2018 (Notification 36/2018-Customs (N.T.)) · 23 May 2018
  63. Official portal Registration - crsbis.in
  64. Official circular DoT WPC File No. R-11018/02/2017-PP dated 06.07.2022 - Compendium of Orders/Circulars/Guidelines on import licensing of wireless equipment · 6 July 2022

Where should you go next?

Comploa Editorial DeskImport compliance researchers

We read the gazette notifications, regulator circulars and portal guidance behind Indian import approvals, and cite the document for every fact. When a rule changes, we update the page and its date. How we research and correct · About Comploa.

Related guides

Terms used on this page

Compulsory Registration Scheme (CRS)BIS's Scheme-II registration: manufacturers of notified products self-declare conformity to an Indian Standard, backed by a recognised lab report, and mark goods with a registration number.R-numberThe unique registration (licence) number BIS issues to a manufacturer under the Compulsory Registration Scheme, printed as part of the CRS Standard Mark on the product or package.Authorised Indian Representative (AIR)An Indian resident nominated by a foreign manufacturer to take responsibility, on its behalf, for compliance with the BIS Act, rules, regulations and licence conditions.EPR certificateA tradeable credit issued on a CPCB portal for waste recycled or processed by a registered entity, which producers buy and file to meet their Extended Producer Responsibility targets.LMPC registrationRegistration of the name and address of a business that pre-packs or imports commodities for sale, under rule 27 of the Legal Metrology (Packaged Commodities) Rules, 2011.Equipment Type Approval (ETA)An approval issued by the WPC Wing of India's Department of Telecommunications, required to import, sell and use wireless devices operating in de-licensed frequency bands.DemurrageA charge levied by a port, terminal or shipping line when imported cargo or containers stay beyond the free period allowed, usually counted per day.Bill of Entry (B/E)The formal declaration an importer files with Indian Customs describing imported goods, their classification and value, so that duty can be assessed and the goods cleared.

Free compliance check

Ship it once. Clear it first time.

Tell us the product, the model and where it is made. We reply with every approval it needs, the official fees, a realistic timeline and the order to file in.

  • Free, no obligation
  • Reply within one working day
  • Every fact sourced