On this page
- Key facts
- What is IS 14286?
- IS 14286 and the standards beside it: who covers what?
- How do you check a solar module against IS 14286 in 6 steps?
- Which parts and sections make up IS 14286 today?
- What should an importer check on a supplier's IS 14286 documents?
- How did existing licensees move from IS 14286:2010 to the 2023 series?
- How has IS 14286 changed, and what replaced the 2010 edition?
- Has IS 14286:2023 been amended?
- Which products and HS codes need IS 14286?
- Which module types does IS 14286 apply to in practice?
- What does IS 14286 testing involve?
- How much does IS 14286 lab testing cost?
- What efficiency must a module reach for an IS 14286-based licence?
- How does IS 14286 link to BIS registration?
- What does BIS registration of a solar module cost?
- How does IS 14286 connect to ALMM?
- Can solar modules made in China or Vietnam get IS 14286 registration?
- What else does a solar module importer need besides IS 14286?
- What does the 2025 solar order cover besides modules?
- IS 14286 worked case: a rooftop installer importing modules
- What goes wrong with IS 14286 certification?
- What could we not confirm about IS 14286?
- Frequently asked questions
- Sources
Key facts at a glance
- Current Part 1
- IS 14286 (Part 1):2023 = IEC 61215-1:2021[1]
- Crystalline section
- IS 14286 (Part 1/Sec 1):2023[2]
- Test procedures
- IS 14286 (Part 2):2023 = IEC 61215-2:2021[3]
- Old edition
- IS 14286:2010 = IEC 61215:2005[4]
- 2019 editions
- Withdrawn[5]
- Old standard last accepted for new licences
- 27 July 2025[4]
- BIS committee
- ETD 28[1]
- Order that uses it
- Solar Systems, Devices and Components Goods Order, 2025[6]
- Scheme
- BIS Scheme-II (CRS), R-number[7]
- Minimum efficiency for licence
- 18% mono / thin film; 17% poly[8]
- Labs listed (Part 1 / Sec 1)
- 9 / 10[9]
- Lab charges listed (2023 sections)
- Rs 7,30,000 to Rs 19,85,000[10]
Checked 1 November 2026 against the regulator's own documents.
What is IS 14286?
IS 14286 is the Indian standard for design qualification and type approval of terrestrial photovoltaic modules: the stress tests that show a solar panel can survive years outdoors. It is the Indian version of the IEC 61215 series, kept by BIS committee ETD 28[1].
The plain number "IS 14286" (the 2010 edition) is no longer the standard BIS certifies new licences to. It was replaced in two steps by a multi-part series that keeps the number but is identical to IEC 61215:
- IS 14286:2010, corresponding to IEC 61215:2005, covered crystalline modules only[4].
- 2019 editions split it into Part 1, Part 1 Sections 1 to 4 and Part 2; BIS shows these as withdrawn[5].
- 2023 editions (third revision), identical to IEC 61215-1:2021, IEC 61215-1-x:2021 and IEC 61215-2:2021, are current[1][3].
For BIS registration of solar panels today, the standards are IS 14286 (Part 1):2023 and the relevant section[8]. We do not reproduce the standard's text; BIS sells it.
IS 14286 and the standards beside it: who covers what?
IS 14286 proves durability; IS/IEC 61730 proves electrical safety; inverters and batteries have their own standards. A module needs both IS 14286 and IS/IEC 61730[8].
| Standard | Covers | Status / role | Source |
|---|---|---|---|
| IS 14286 (Part 1, Sec 1-4, Part 2):2023 | Module design qualification | Current; required by the 2025 order | [8] |
| IS/IEC 61730-1 and -2 | Module safety | 2016 editions; 2023 editions run concurrently until 15 Feb 2027 | [11] |
| IS 16077:2013 | Thin-film modules (old) | Replaced by IS 14286 (Part 1) Sec 2-4 | [4] |
| IS/IEC TS 62915 | Retesting after design changes | Used for bill-of-materials changes | [4] |
| IS 16221, IS 16169, IS 17980 | Solar inverters | Separate products in the same order | [8] |
How do you check a solar module against IS 14286 in 6 steps?
Check the edition, the section, the model, the bill of materials, the efficiency and the safety standard. The approval checker confirms what else applies.
- 1Check the edition
The licence and report should cite IS 14286 (Part 1):2023, not IS 14286:2010 or IS 16077:2013[4].
- 2Match the section to the technology
Sec 1 crystalline, Sec 2 CdTe, Sec 3 amorphous silicon, Sec 4 CIGS[12].
- 3
- 4Check the bill of materials
A change of cell, glass, backsheet or junction box needs retesting under IEC TS 62915[4].
- 5Check efficiency
Pmax and area must give at least 18% (mono, thin film) or 17% (poly)[8].
- 6Check the safety standard
The licence should also cover IS/IEC 61730-1 and -2[15].
Which parts and sections make up IS 14286 today?
The 2023 series has a general part, one section per module technology, and a test procedures part, all identical to the matching IEC documents under dual numbering.
| Indian Standard | IEC equivalent | Covers | Replaces | Source |
|---|---|---|---|---|
| IS 14286 (Part 1):2023 | IEC 61215-1:2021 | Test requirements for all module types | IS 14286 (Part 1):2019 | [1] |
| IS 14286 (Part 1/Sec 1):2023 | IEC 61215-1-1:2021 | Crystalline silicon modules | Sec 1:2019 | [2] |
| IS 14286 (Part 1/Sec 2):2023 | IEC 61215-1-2:2021 | Thin-film CdTe modules | Sec 2:2019 | [12] |
| IS 14286 (Part 1/Sec 3):2023 | IEC 61215-1-3:2021 | Thin-film amorphous silicon modules | Sec 3:2019 | [12] |
| IS 14286 (Part 1/Sec 4):2023 | IEC 61215-1-4:2021 | Thin-film CIGS modules | Sec 4:2019 | [12] |
| IS 14286 (Part 2):2023 | IEC 61215-2:2021 | Test procedures | IS 14286 (Part 2):2019 | [3] |
What should an importer check on a supplier's IS 14286 documents?
Check that the BIS registration, not just a foreign certificate, names your exact model and the 2023 standards. Suppliers often send IEC 61215 certificates from foreign bodies or old Indian reports; a foreign IEC 61215 certificate on its own is not a BIS licence, because BIS registers on reports from BIS-recognised labs[16].
- The edition. The licence and test report should cite IS 14286 (Part 1):2023 and the right section, not IS 14286:2010 or IS 16077:2013[4].
- The model and wattage. Unregistered models cannot be imported or sold[13].
- The bill of materials. Ask for the cell, glass, backsheet and junction-box list in the report and compare it with the shipment[4].
- The efficiency page. Pmax, area and calculated efficiency must be reported[4].
- The safety standard. IS/IEC 61730-1 and -2 should be on the same registration[15].
Our guide to reading a BIS test report and the CRS documents list help.
How did existing licensees move from IS 14286:2010 to the 2023 series?
By retesting representative models and applying through the Standard Revision module before the deadline; models left on the old standards are deleted from licences[4].
- 1Pick representative models
Retest representative models to the IS 14286 2023 series and IS/IEC 61730:2016[4].
- 2Apply through Standard Revision
Submit the new reports through the CRS portal's Standard Revision module[4]; see the BIS CRS portal.
- 3Drop non-compliant models
Models still on IS 14286:2010 or IS 16077:2013 are deleted after the deadline[4].
- 4Plan the next switch
IS/IEC 61730 2023 editions run concurrently until 15 February 2027, with partial testing for existing models[11].
How has IS 14286 changed, and what replaced the 2010 edition?
The 2023 series replaced both IS 14286:2010 and the separate thin-film standard IS 16077:2013, and no new licence on the old standards was granted after 27 July 2025[4]. Many supplier certificates and older tenders still quote the old numbers.
| Date | Event | Source |
|---|---|---|
| 15 Feb 2027 | End of concurrent running of IS/IEC 61730 2016 and 2023 editions | [11] |
| 1 Nov 2025 | REEIMS registration needed before importing modules for solar projects | [17] |
| 27 Jul 2025 | 2025 solar order in effect; last date for new applications on old standards | [11][4] |
| 27 Mar 2025 | BIS guidelines for moving licences to the 2023 series | [4] |
| 27 Jan 2025 | MNRE notifies the 2025 order, S.O. 492(E) | [6] |
| 2023 | IS 14286 2023 series published; 2019 editions withdrawn | [5] |
| 31 Mar 2019 | Crystalline and thin-film modules on the CRS list | [15] |
| 30 Aug 2017 | First solar order names IS 14286 and IS 16077 | [18] |
Has IS 14286:2023 been amended?
No amendment is listed. BIS lists none for IS 14286 (Part 1):2023[1], and none but one corrigendum for the crystalline section[2].
The 2025 order applies the latest version of each standard, with amendments notified by BIS, from the date of notification[8], so a future amendment would apply to CRS without a new order. Watch the QCO tracker and new rules 2026.
Which products and HS codes need IS 14286?
Crystalline silicon and thin-film terrestrial PV modules, two of the five products in MNRE's 2025 solar order[6]. Modules are imported under ITC(HS) 85414300, and loose cells under 85414200[17].
| CRS category | Standards on the CRS list | Implemented from | Source |
|---|---|---|---|
| Crystalline silicon terrestrial PV modules | IS 14286 (Part 1/Sec 1):2023 + IS/IEC 61730-1 and -2 | 31 March 2019 | [15] |
| Thin-film terrestrial PV modules (a-Si, CIGS, CdTe) | IS 14286 (Part 1/Sec 2, 3 or 4):2023 + IS/IEC 61730-1 and -2 | 31 March 2019 | [15] |
Which module types does IS 14286 apply to in practice?
Mono and poly crystalline panels use Section 1; CdTe, amorphous silicon and CIGS panels use Sections 2, 3 and 4[12]. Part 1 applies to all of them[4]. The 2023 series also adds rules for bifacial modules and tests for flexible modules[4].
IS 14286 does not cover module safety (IS/IEC 61730)[8], or inverters, which use IS 16221, IS 16169 and IS 17980[8]. See solar inverters.
What does IS 14286 testing involve?
BIS's March 2025 guidelines describe the main changes from the 2010 edition, which show what labs now test[4]:
- Structure. Part 1 sets general requirements, Part 1-x technology-specific ones and Part 2 defines the tests, all module quality tests (MQTs).
- Sampling rewritten.
- Two pass/fail gates: measured values against the nameplate, and power before and after stress.
- New and revised tests: hot-spot (MQT 09), insulation (MQT 03), stabilisation including boron-oxygen light-induced degradation (MQT 19), cyclic dynamic mechanical load (MQT 20), potential-induced degradation (MQT 21), bending for flexible modules (MQT 22), and junction-box weights during 200 thermal cycles (MQT 11).
- Retesting after design or material changes follows IEC TS 62915.
BIS requires series formation under clause 4 of IS 14286 (Part 1), with retests for bill-of-materials changes[4].
What the two gates mean for a buyer. Under the 2023 series a module can fail before any stress test if its measured electrical values do not match the nameplate, and fail again if it loses too much power after the stress sequence[4]. That makes nameplate accuracy a certification issue, not just a marketing one: a factory that rounds Pmax up on the label risks failing the first gate. The stabilisation test, including boron-oxygen light-induced degradation, also means labs need more time per sample than they did under the 2010 edition[4], which is one reason test charges for the 2023 sections are roughly double the old ones[10].
How much does IS 14286 lab testing cost?
Far more than any other standard on this site: BIS's laboratory system lists Rs 7,30,000 to Rs 19,85,000 per 2023 section, excluding taxes, against Rs 7,00,000 to Rs 9,63,359 for the old 2010 edition[10]. IS/IEC 61730 safety testing is extra.
Few labs do it: BIS's portal listed 9 laboratories for Part 1 and 10 for Section 1 on 1 November 2026[9][2]. See BIS CRS test labs and BIS labs.
| Laboratory and scope | Charge |
|---|---|
| URS Products and Testing, Noida, Sec 2-4:2023 | Rs 7,30,000 |
| Alpha Test House Services, Mohali, Sec 1-4:2023 | Rs 14,50,000 |
| Bharat Test House, Sec 1-4:2023 | Rs 15,02,500 |
| Delhi Test House, Sonipat, 2023 sections | Rs 16,00,000 |
| Hi Physix Laboratory, Pune, Sec 1:2023 | Rs 18,35,000 |
| Hi Physix Laboratory, Pune, Sec 2-4:2023 | Rs 19,85,000 |
| Old IS 14286:2010, range | Rs 7,00,000 to Rs 9,63,359 |
What efficiency must a module reach for an IS 14286-based licence?
At least 18% for mono-crystalline and thin-film modules and 17% for poly-crystalline, calculated as Pmax / (1000 x module area) x 100 using IS 14286 values[8]. Labs report Pmax, area and calculated efficiency[4].
Worked example. A mono module with a measured Pmax of 400 W and an area of 2.0 m2 gives 400 / (1000 x 2.0) x 100 = 20%, above the 18% floor. The same 400 W on 2.3 m2 gives about 17.4%, below 18% for mono, so it cannot be licensed, though a poly module at that figure would pass the 17% floor[8]. ALMM sets higher thresholds again, such as 20.0% for utility-scale crystalline modules[19].
How does IS 14286 link to BIS registration?
IS 14286 is applied through BIS Scheme-II (CRS)[7]. The registration goes to the module manufacturer for each factory[13]; foreign makers need an Authorised Indian Representative[16], and only reports from BIS-recognised labs count[16].
The 2010-to-2023 switch. Existing licensees had to retest representative models to the 2023 series and apply through the Standard Revision module; models still on IS 14286:2010 or IS 16077:2013 are deleted from licences after the deadline[4]. Licences granted under the 2017 order stay valid, but fresh registrations and renewals use the 2025 order[8].
The Standard Mark for modules shows IS 14286 (Part 1/Sec x)/IEC 61215-1-x, IS/IEC 61730-1 and -2 and the R-number[4]. See BIS CRS and CRS labelling.
What does BIS registration of a solar module cost?
BIS's CRS fees are Rs 1,000 application, Rs 50,000 processing including one test report, and Rs 1,000 a year licence fee[20]. Adding models costs Rs 30,000 including one report, plus Rs 20,000 per extra report[20]. GST is extra[20].
Worked example. A foreign crystalline-module maker registering one series with a Section 1 test at Rs 14,50,000[10] pays Rs 1,000 + Rs 50,000 + Rs 1,000 in BIS fees, so about Rs 15,02,000 before IS/IEC 61730 testing and GST. A CRS licence is now granted for five years[21]. See CRS fees and the CRS fee calculator.
How does IS 14286 connect to ALMM?
ALMM List-I depends on a valid BIS registration; if BIS registration lapses, the model is deemed delisted[19]. So IS 14286 certification is the entry ticket to ALMM.
ALMM modules are required for government, government-assisted, scheme, open access and net-metering projects[22]. From 1 June 2026, List-I keeps only modules using ALMM List-II cells[23], and List-III for ingots and wafers is set for 1 June 2028[24].
Three details trip importers. The first List-II for cells was issued on 31 July 2025, and net-metering and open access projects commissioned before 1 June 2026 are exempt from the cell rule[25]. A separate List-I(a) holds modules without List-II cells for exempted projects[23]. And schemes such as PM-KUSUM and PM Surya Ghar carry their own Domestic Content Requirement for cells and modules, separate from ALMM[25]. None of this changes IS 14286 testing, but it decides whether a BIS-registered imported module can be used in a given project.
Can solar modules made in China or Vietnam get IS 14286 registration?
Yes. CRS registration is granted to the manufacturer for each factory, wherever it is[13], and a foreign maker nominates an Authorised Indian Representative, which can be its Indian branch, the brand owner or another Indian entity[16][26]. Samples must be tested in a BIS-recognised lab[16], so allow for shipping modules to India and for lab queues at the handful of labs listed[9].
ALMM is the harder gate for imported modules: from 1 June 2026 List-I keeps only modules using List-II cells[23]. See the China import guide, the Vietnam guide and foreign manufacturers.
What else does a solar module importer need besides IS 14286?
Modules for solar projects need REEIMS registration with MNRE before import, from 1 November 2025: free, valid three months and specific to one port[17]. Producers must register under the E-Waste Rules and store solar waste up to 2034-35[27]; see e-waste EPR. The BEE label is voluntary for modules[28]. Check deadlines with the QCO deadline checker and the compliance cost estimator.
What does the 2025 solar order cover besides modules?
Five products, of which modules are two. MNRE's order, S.O. 492(E) of 27 January 2025, superseded the 2017 order, requires the listed standards and the Standard Mark under Scheme-II, exempts export goods and came into force 180 days after publication[6]; BIS says it has been in effect since 27 July 2025[11]. The other products include PV inverters, which use IS 16221 and related standards[8].
The 2017 order it replaced had listed crystalline modules under IS 14286, thin-film under IS 16077, safety under IS/IEC 61730, power converters, grid-tied inverters and storage batteries[18]. BIS is the certifying and enforcing authority, market surveillance is by BIS or agencies it notifies with MNRE, and breaches are punishable under the BIS Act[8].
IS 14286 worked case: a rooftop installer importing modules
An installer imports 500 kW of mono modules from a foreign factory for net-metering rooftop projects.
- The factory must hold a BIS registration covering the model under IS 14286 (Part 1/Sec 1):2023 and IS/IEC 61730[15].
- Net-metering projects need ALMM List-I modules[22], which for rooftop crystalline modules means at least 19.5% efficiency[19], higher than BIS's 18% floor[8].
- Because the modules are for solar projects, the installer registers on REEIMS at least 5 days before a sea shipment[17].
- Producer obligations under the E-Waste Rules apply to solar modules[27].
Ask for a free compliance check if your shipment mixes modules and inverters.
What goes wrong with IS 14286 certification?
Mostly old paperwork and silent design changes.
| Problem | Why it matters | Fix | Source |
|---|---|---|---|
| Report cites IS 14286:2010 or IS 16077 | Not accepted for new licences after 27 Jul 2025 | Retest to the 2023 series | [4] |
| Foreign IEC 61215 certificate only | BIS registration needs a BIS-recognised lab report | Test in a listed lab | [16] |
| Cell or backsheet supplier changed | BOM change needs IEC TS 62915 retest | Retest before shipping | [4] |
| Efficiency below 18% (mono) | Cannot be licensed | Check Pmax and area first | [8] |
| New wattage not on licence | Unregistered models cannot be imported | Include the model | [13][14] |
| No REEIMS registration | Required for project imports since 1 Nov 2025 | Register 5 days ahead for sea cargo | [17] |
What could we not confirm about IS 14286?
Frequently asked questions
Is IS 14286 still valid?
Has IS 14286 been replaced by IEC 61215?
Which IS 14286 section applies to crystalline solar panels?
What standard did IS 14286:2010 correspond to?
IEC 61215:2005[4].
What happened to IS 16077 for thin-film modules?
How much does IS 14286 testing cost?
Labs on BIS's system list Rs 7,30,000 to Rs 19,85,000 per 2023 section, excluding taxes[10].
How many labs test IS 14286?
BIS's portal listed 9 labs for Part 1 and 10 for Section 1 on 1 November 2026[9].
What minimum efficiency does BIS require for solar modules?
18% for mono-crystalline and thin-film modules and 17% for poly-crystalline[8].
Does IS 14286 cover module safety?
No. Electrical safety is IS/IEC 61730-1 and -2, required alongside it[8].
Is BIS registration enough for ALMM?
Who keeps IS 14286 at BIS?
The Solar Photovoltaic Energy Systems Sectional Committee, ETD 28[1].
Do I need REEIMS registration to import solar panels?
Yes, for modules used exclusively in solar energy projects, from 1 November 2025; registration is free and valid for three months at one port[17].
Sources 28 documents, 28 official
Each number in the text links to the document below. Labels show the type of source; see our editorial policy.
- Official portal BIS Know Your Standards: IS 14286 (Part 1):2023
- Official portal BIS Know Your Standards: IS 14286 (Part 1/Sec 1):2023
- Official portal BIS Know Your Standards: IS 14286 (Part 2):2023
- Official circular BIS Guidelines for Implementation of Revised QCO for Solar PV Modules (27 Mar 2025) · 27 March 2025
- Official portal BIS Know Your Standards: IS 14286 (Part 1/Sec 1):2019
- Gazette Solar Systems, Devices and Components Goods Order, 2025 (Gazette copy on BIS site) · 27 January 2025
- Official portal BIS - Products under Compulsory Certification, Scheme-II (Registration Scheme/CRS), last updated 26 Oct 2026 · 26 October 2026
- Gazette Solar Systems, Devices and Components Goods Order, 2025 · 27 January 2025
- Official portal BIS Know Your Standards: IS 14286 (Part 1):2023 and Part 2:2023 · 1 November 2026
- Official portal BIS LIMS: search by IS number (IS 14286) · 1 November 2026
- Official circular BIS guidelines for transition to IS/IEC 61730-1/-2:2023 (30 Dec 2025) · 30 December 2025
- Official portal BIS Know Your Standards: IS 14286 (Part 1/Sec 2-4):2023
- Official portal About CRS - crsbis.in
- Official portal Inclusion and Renewal - crsbis.in
- Official portal Products under CRS - crsbis.in (Products BIS list)
- Official circular Guidelines for Grant of Licence (GoL) under Scheme-II of Schedule-II, BIS (Conformity Assessment) Regulations 2018, Ref RG:01 · 20 August 2019
- Gazette DGFT Notification 40/2025-26 (S.O. 4669(E)), copy hosted on MNRE's REEIMS portal · 10 October 2025
- Gazette Solar PV Goods (Requirements for Compulsory Registration) Order, 2017 · 30 August 2017
- Official circular MNRE O.M. 29 April 2024, Updation of ALMM List-I (Revision XXIV) · 29 April 2024
- Official portal BIS CRS Fee Structure (applicable w.e.f. 04 June 2018) · 4 June 2018
- Official circular BIS notice: Revised Provisions for Licence Validity, Renewal and Annual Fee Payment under CRS (circular dated 27 May 2026) · 27 May 2026
- Official circular MNRE O.M. No. 283/64/2025-GRID SOLAR, FAQs on ALMM for solar PV cells (23 Sep 2025) · 23 September 2025
- Official circular MNRE O.M. No. 283/59/2024-GRID SOLAR, 9 Dec 2024 · 9 December 2024
- Official circular PIB release: Government Extends ALMM Framework to Solar Ingots and Wafers (18 Mar 2026) · 18 March 2026
- Official circular MNRE O.M. No. 283/64/2025-GRID SOLAR, FAQs (23 Sep 2025) · 23 September 2025
- Official portal CRS Checklist: Documents to be submitted with application for Registration
- Gazette E-Waste (Management) Rules, 2022 · 2 November 2022
- Gazette BEE (Appliance Labeling and Compliance) Regulations, 2026 · 26 December 2025